Extended Well Testing
Weatherford assists our clients with the complete engineering support required to put together a facility for an extended well test. We can perform all detailed engineering design, the HAZOP, and the extensive safety studies including the safety case. The scope of service includes the conventional installation of the EWT process package on a drilling rig to the non-conventional use of a supply boat or a small tanker for the package platform. In all cases Weatherford can also provide full marine engineering support.
- Reservoir Appraisal at Minimum Cost
- Produced Oil Recovered for Sale
- Use of Standard Well Test Equipment
- Application On & Offshore
- Typical Duration min. 3 Month
