Artificial Lift
Capillary Injection
ClearWELL Technology
Coalbed Methane
Coiled Tubing Technology
COROD Continuous Rod
Electric Submersible Pumping
Engineered Chemistry
Flow Measurement
Gas Lift
Gas-Well Deliquification
Heavy Oil
Hydraulic Lift
Hybrid Lift Technologies
Injection Systems
Pipeline and Specialty Services
Plunger Lift
Production and Produced Water Systems
Production Optimization
Progressing Cavity Pumping
Pump and Fluid Systems
Reciprocating Rod Lift
Reservoir Monitoring
Software
Sucker Rods
Testing and Production Services
 
 
 
 

Coiled-Tubing Services


Weatherford’s new Intrepid™ coiled tubing unit has arrived in South Texas and is staged at our new San Antonio facility on Hwy 37 South of San Antonio. Crews have been trained in the driving techniques required for this size vehicle as well as in the technologically advanced equipment incorporated within the Intrepid.

Coiled-Tubing Truck
 
Again, the impressive operation depths of the Intrepid unit are: 25,000 ft (7,620 m) with 2 3/8-in coil or 30,000 ft (9,144 m) with 2-in. coil

If you have an interest in the capability of this extended-reach coiled tubing unit, contact us online at weatherford.force.com/CPP and someone will get back to you soon.

For your viewing here are some shots of this new unit.


  • Coiled Tubing 1
  • Coiled Tubing 2
  • Coiled Tubing 3 
  • Coiled Tubing 4
  • Coiled Tubing 5
  • Coiled Tubing 6
  • Coiled Tubing 7
  • Coiled Tubing 8
  • Coiled Tubing 9
  • Coiled Tubing 10 
  • Coiled Tubing Truck Side
 

 
 


 
Coiled Tubing Technology-1
  © 2013 Weatherford All Rights Reserved