Highlighted Case Studies

All highlighted case studies

Fat Boy® PCP with Top-Tier System Increase MTBF from 55 to 370 Days, Decrease OPEX by 84%, Saves $2

Argentina

ForeSite® Edge Boosts Production 2%, Reduces Wellsite Visits 80%, Reduces Failures 15%, Increases Re

Wyoming, USA

Rod-Lift Solutions, Maximizer® Pumping Units Reduced OPEX 16% and Workover Costs 75% within Failure-

Northwest Oklahoma

Weatherford and Ardyne Technologies Deliver Innovative Casing-Recovery Solution for Fewer POB, Less

Norway

Integrated Solution and Centro™ Platform Deliver Well 62% Faster With 32% More Production

Comalcalco, Tabasco, Mexico

ForeSite® Platform Delivers ROI in 2 Months, Reduces Downtime 30%, Increases Production 2% In 111 Ma

South Sumatera, Indonesia

ForeSite® Edge Boosts Production, Reduces Wellsite Visits 70%, Maintains Pump Fillage Above 70%, Inc

Williston Basin, North Dakota USA

Magnus® Rotary Steerable System Delivers 6-In. Section in 1 Run, Saves 9 Days of Drilling Time

Black Sea, Romania

Firma™ Abandonment Solution Delivers Permanent Well Abandonment, Cuts Rig Time by 7 Days in Challeng

United Kingdom, North Sea

Firma™ Abandonment Solution Helps Customer to P&A 13 North Sea Wells and Save 125 Days Worth $35 Mil

North Sea, United Kingdom Continental Shelf (UKCS)