Highlighted Case Studies

All highlighted case studies

Firma™ Abandonment Solution Helps Kill, Plug 10 Wells in 234 Days, Saves Operator $10.8 Million in G

Mississippi Canyon, Gulf of Mexico, USA

Firma™ Abandonment Solution Saves Operator $6.7 Million on Hurricane-Damaged Platform

Gulf of Mexico

Firma™ Solution Provides Permanent Abandonment for 32 Wells, Finishes 150 Days Early

North Sea, United Kingdom

RipTide® RFID Underreamer Enlarges Borehole, Saves 14+ Hours of Deepwater Rig Time Valued at $150,00

Deepwater Malaysia

AccuView® System and Centro™ Platform Enable Flawless Liner Installation, Remote Collaboration, and

Middle East

ForeSite® Edge Autonomous Gas Lift Reduces OPEX 78%, Increases Production 5%, Reduces Buyback Gas 30

Kingfisher County, Oklahoma, USA

ForeSite® Edge Boosts Production 6%, Reduces Wellsite Visits 70%, Reduces Failures 15%, Increases Re

Illinois, USA

Victus™ Intelligent MPD and SeaShield® RCD Save 5 Days of Drilling Through a Narrow Mud Weight Windo

Offshore Myanmar

ForeSite® Sense Reservoir Monitoring Solution Informs Reservoir Strategy with Real-Time Flow Data,

Norwegian North Sea

Integrated Lower Completion With SwageSet Liner System and Maxflo® Screen Installation Uses Minimal

Saudi Arabia