Real Results
Performance By The Numbers
Saves 3 Days of Rig Time Drilling 2.5-Mile Lateral in Delaware Basin
Location
Well Type
Formation
Hole Size and Angle
Section Total Depth
Total Footage Drilled
Total Circulating Hours
Total Drilling Hours
Average ROP
Products/Services
With a modular and easy-to-maintain design, the Magnus RSS enabled quick deployment within 12 hours.
Take the next step in realizing the field of the future. Submit your details and one of our optimization experts will be in touch.