Resource Hub
LATEST BROCHURES
-
Red Eye® Subsea Water-Cut Meter
May 16, 2023
Deepwater, Production
-
Raptor 2.0 Cased-Hole Reservoir Evaluation System
April 11, 2023
Aging Reservoirs, Conventional, Formation Evaluation, Unconventional
-
VERO® OneTouch Automated Tubular System Vss
March 3, 2023
Tubular Running Services
-
Production and Intervention Solutions VSS
March 1, 2023
LATEST TECHNICAL SPECIFICATIONS
-
Drillpipe Circulation Tool
June 6, 2023
Tubular Running Services
-
Memory Raptor Cased-Hole Evaluation System
January 23, 2023
Formation Evaluation
-
Xpress XT Pressure Balanced Liner System
January 10, 2023
Drilling
-
Magnus Rotary Steerable System
January 10, 2023
Drilling
LATEST HIGHLIGHTED CASE STUDIES
-
WidePak™ Straddle Packer System Restored Well Integrity in Four Corroded Wells, Saved $20 Million in Workover Costs
Denmark, North Sea
-
Firma Plug and Abandonment Solutions Safely Decommissioned 21 Phase III Wells In Turnkey Project with International Operator
Australia
LATEST REAL RESULTS
-
Firma Plug and Abandonment Solutions Safely Decommissioned 21 Phase III Wells In Turnkey Project with International Operator
June 2, 2023
Australia
-
Electrically Actuated Motor-Valve (EAMV) Reduces Emissions in Remote Sour-Gas Well, Saves Automation/Controller, $23K Annual OPEX
May 31, 2023
Oman
-
ShockWave® Sonic Tool Delivered Real-Time Compressional Slowness Data in Large OD Borehole Through Poorly Consolidated Formations in Mexico
May 15, 2023
Mexico
-
LWD Quad Combo Obtained Quality Data in First Deployment in 14 1/2-in. Shallow Water Wellbore, Saved 2 Days Rig Time and Reduced Operating Costs
May 2, 2023
Mexico
LATEST PAPERS
-
Casing Exit to Casing Entry - A Novel Concept for the Abandonment Process in Intersect Applications
April 24, 2023
-
Damaged Control Line Solution to Sustain Functional Downhole Safety Valve and Avoid Completions Recovery
April 24, 2023