Resource Hub

Advanced Search

LATEST BROCHURES

  • Red Eye® Subsea Water-Cut Meter

    May 16, 2023
    Deepwater, Production

  • Raptor 2.0 Cased-Hole Reservoir Evaluation System

    April 11, 2023
    Aging Reservoirs, Conventional, Formation Evaluation, Unconventional

  • VERO® OneTouch Automated Tubular System Vss

    March 3, 2023
    Tubular Running Services

  • Production and Intervention Solutions VSS

    March 1, 2023

LATEST TECHNICAL SPECIFICATIONS

  • Drillpipe Circulation Tool

    June 6, 2023
    Tubular Running Services

  • Memory Raptor Cased-Hole Evaluation System

    January 23, 2023
    Formation Evaluation

  • Xpress XT Pressure Balanced Liner System

    January 10, 2023
    Drilling

  • Magnus Rotary Steerable System

    January 10, 2023
    Drilling

LATEST HIGHLIGHTED CASE STUDIES

  • WidePak™ Straddle Packer System Restored Well Integrity in Four Corroded Wells, Saved $20 Million in Workover Costs

    Denmark, North Sea

  • Firma Plug and Abandonment Solutions Safely Decommissioned 21 Phase III Wells In Turnkey Project with International Operator

    Australia

  • Wireline Solution Saves $300,000 by Freeing Stuck Pipe Without Explosives in Geothermal Well

    Tuscany, Italy

  • Electrically Actuated Motor-Valve (EAMV) Reduces Emissions in Remote Sour-Gas Well, Saves Automation/Controller, $23K Annual OPEX

    MENA, Oman

LATEST REAL RESULTS

  • Firma Plug and Abandonment Solutions Safely Decommissioned 21 Phase III Wells In Turnkey Project with International Operator

    June 2, 2023
    Australia

  • Electrically Actuated Motor-Valve (EAMV) Reduces Emissions in Remote Sour-Gas Well, Saves Automation/Controller, $23K Annual OPEX

    May 31, 2023
    Oman

  • ShockWave® Sonic Tool Delivered Real-Time Compressional Slowness Data in Large OD Borehole Through Poorly Consolidated Formations in Mexico

    May 15, 2023
    Mexico

  • LWD Quad Combo Obtained Quality Data in First Deployment in 14 1/2-in. Shallow Water Wellbore, Saved 2 Days Rig Time and Reduced Operating Costs

    May 2, 2023
    Mexico

LATEST PAPERS

  • Casing Exit to Casing Entry - A Novel Concept for the Abandonment Process in Intersect Applications

    April 24, 2023

  • Damaged Control Line Solution to Sustain Functional Downhole Safety Valve and Avoid Completions Recovery

    April 24, 2023

  • Real-Time Machine Learning Application for Formation Tops and Lithology Prediction

    April 24, 2023

  • Using Advance Modelling Techniques to Design Diversion for Acidizing, Fracturing & Re-Fracturing

    March 20, 2023

LATEST MULTIMEDIA

 
The Energy of Innovation
July 12, 2022
 
We Keep the Ball Rolling
July 10, 2020
 
Mature Field Solutions
April 30, 2020
 
Digitalization and Automation Solutions
April 30, 2020