Papers

All papers

Date Name
Nov 07
2016
Deepest Section Drilled Successfully to TD Using an Advanced Air/Foam System in Highly Fractured Formations of Cretaceous Age in Sulaiman Fold Belt, Pakistan – A Case History

Abu Dhabi International Petroleum Exhibition & Conference, 7-10 November, Abu Dhabi, UAE

Nov 07
2016
Optimizing Unconventional Completions - An Integrated Approach

Abu Dhabi International Petroleum Exhibition & Conference, 7-10 November, Abu Dhabi, UAE

Nov 07
2016
Automated MPD Control System Helps Navigate Through Drilling Problems, Meets Objectives in Shakal Block, North Iraq

Abu Dhabi International Petroleum Exhibition & Conference, 7-10 November, Abu Dhabi, UAE

Nov 07
2016
Advances in Modern Produced Water Utilization as an Economical Solution in Completion Design: A Cumulative Case Study Review of Field Applications in the Permian Basin

Abu Dhabi International Petroleum Exhibition & Conference, 7-10 November, Abu Dhabi, UAE

Nov 07
2016
Recent Advancements in Temporary Diversion Technology for Improved Stimulation Performance

Abu Dhabi International Petroleum Exhibition & Conference, 7-10 November, Abu Dhabi, UAE

Nov 07
2016
Implementation of Under-Balanced Drilling. A New Approach for Reservoir Characterization to Improve the Development Strategy of a Tight Carbonate Reservoir

Abu Dhabi International Petroleum Exhibition & Conference, 7-10 November, Abu Dhabi, UAE

Nov 07
2016
First Application in Sui Field of Near-Balanced Nitrified Foam Drilling Resulted in Record Drilling Time to Reach TD; in Pakistan – A Case History

Abu Dhabi International Petroleum Exhibition & Conference, 7-10 November, Abu Dhabi, UAE

Nov 07
2016
Using Cf-252 as a Short Half-Life Neutron Source Provides a Safe and Reliable Porosity Alternative When Drilling in a Middle East Carbonate Reservoir

Abu Dhabi International Petroleum Exhibition & Conference, 7-10 November, Abu Dhabi, UAE

Nov 07
2016
Enhance ECD Management Using Sub-Based Uninterrupted Circulating System Application

Abu Dhabi International Petroleum Exhibition & Conference, 7-10 November, Abu Dhabi, UAE

Nov 01
2016
Plunger Lift System Restores Production in Previously Abandoned Gas Condensate Well (Russian)

SPE Annual Caspian Technical Conference & Exhibition, 1-3 November , Astana, Kazakhstan