Real Results
Performance By The Numbers
Exceed Planned ROP by 40%, Save 5 Days’ Rig Time
Location
Well Type
Hole Size And Angle
Temperature
Depth In
Total Depth
Products/Services
A geosteering solution featuring the Magnus RSS helped an operator to avoid NPT and reduce rig time worth nearly half a million dollars.
Take the next step in realizing the field of the future. Submit your details and one of our optimization experts will be in touch.