Real Results
Performance By The Numbers
Reduced OPEX 16% and Workover Costs 75% within Failure-Prone, 100-Well ESP Asset
Location
Lift Type
Well Type
Well Depth
Formation
Products/Services
Maximizer III surface pumping units paired with KDP heavy-load sucker rods and King Cobra severe-service rod guides replaced ESPs suffering from low-production rates and frequent workovers.
Take the next step in realizing the field of the future. Submit your details and one of our optimization experts will be in touch.