Real Results

Performance By The Numbers

Innovative Chrome Handling

Protects Pipe Integrity With Zero Incidents, Bests Expectations in First U.S. Land Run of 25Cr-80 Tubulars

Objectives

  • Successfully run 25Cr-80 casing for the first time on U.S. land.
  • Identify specific equipment requirements to address the unique hardness and sensitivity of chrome tubulars.
  • Ensure zero damage to casing and maintain operational efficiency.

Our Approach

  • In collaboration with the customer, Weatherford experts leveraged the Weatherford AI-assisted knowledge base to identify specific chrome running and handling procedures. Additionally, the team verified material handling protocols with Vallourec/VAM-USA.
  • As a result of identifying a gap in the chrome casing handling equipment, engineers selected a hydraulic spider that met the rigorous Weatherford chrome-handling standards.
  • The team selected customized grit face dies for the 9 5/8-in. casing and specialty coated dies for the Volant CRT and power tongs.
  • Weatherford also collaborated with the pipe supplier to confirm that hydraulic slips were not required for 9 5/8-in. casing due to the unique surface hardness achieved through a specialized manufacturing process.

Value to Customer

  • Zero Incidents: The casing was run without any damage or safety incidents. Speed limits were in place based on connection makeup procedure and the pipe handling arm in place on the rig.
  • Operational Efficiency: The 9 5/8-in. casing was run in 28 hours and the 7-in. liner in 21 hours—both faster than customer expectations.
  • Customer Satisfaction: The successful execution led to additional work being awarded to Weatherford.
Details

Location

Kern County, California

Well Type

Carbon capture

Hole Size

9-5/8 in. and 7 in.

Casing Size and Type

9-5/8 in. x 43.5 ppf 25Cr-80, Vam21

Liner Size and Type

7 in. x 26 ppf 25Cr-80, Vam21

Depth

9-5/8 in.: 6,500 ft (1,981 m)
7 in.: 2,600 ft (792 m)

Other

The rig has a small floor, which makes operations more difficult and communication between the rig crew and casing crew extremely important.

Products/Services

The 9 5/8-in. 25Cr-80 Vam21 on the pipe handler.

Contact Weatherford

Take the next step in realizing the field of the future. Submit your details and one of our optimization experts will be in touch.