Highlighted Case Studies

All highlighted case studies

Weatherford ROk-ANkOR Slip System Achieves Operator’s Deepest Installation of a Straddle Isolation K

Saudi Arabia

Single-Trip Completion and Stimulation Delivers $1 Million in Rig Time Savings and 5 Days of Early P

Mexico

Rotaflex® Pumping Unit Eliminated Failures and Decreased OPEX by 75%, Saves $1.1 Million in First 2

Colombia

Vero® Conventional System Achieves Zero Rejected Joints While Running More Than 1,200 Connections

Arabian Sea, Qatar

Firma™ Abandonment Solution Delivers 64 Wells 44% Ahead of AFE in Pilot Project for Major Operator

Southeast Asia

Innovative Perf-and-Plug System Saves More Than $800,000 by Recovering OBM and Setting Environmental

United Kingdom, North Sea

Integrated Drilling Solution Improves Well-to-Well Performance, Saves More Than 42 Days of Rig Time

Comalcalco, Tabasco, Mexico

Magnus® RSS and Quad-Combo LWD Technology Exceed Planned ROP by 40%, Save 5 Days’ Rig Time

Mexico

Firma™ Solution Including Custom Cutting Tool Cuts 27 Cemented Platform Well Conductors in a Batch P

North Sea, Norway

Fat Boy® PCP with Top-Tier System Increase MTBF from 55 to 370 Days, Decrease OPEX by 84%, Saves $2

Argentina