Real Results

All real results

Date Name
Jan 28
2025
Permanent Tubing Patch, Rigless Well Integrity Diagnostics Restores Oil Production in Two Wells, Saves CAPEX of $3.8 Million USD

Completions, Real Result, Weatherford World

Jan 28
2025
Magnus® Rotary Steerable System Achieves First Batch Drilling in Gulf of Thailand, 8.5-in. Sections Drilled to TD in Single Run Across 6 Consecutive Wells

Drilling, Real Result, Weatherford World

Jan 24
2025
Compact™ Logging Tools Uncovered Valuable Petrophysical Information Behind Casing in Sump Well, Confirmed New Zones For Injection, Sealing

Formation Evaluation, Real Result, Weatherford World

Jan 10
2025
AlphaV™ Single-Trip Casing-Exit System and AccuView®real-time remote support enabled Equinor to exit 13 3/8-in. casing in adverse wellbore conditions with enhanced efficiency and reliability

Intervention and Abandonment, Real Result, Weatherford World

Jan 10
2025
Real-Time SineWave™ Image Data Optimizes Decision Making While Drilling, Ensures Precise Well Placement in Horizontal Extended-Reach Well

Formation Evaluation, Real Result, Weatherford World

Dec 11
2024
Field-Proven ISO Ultra Extreme Bridge Plug Isolates HPHT North Sea Well Without Need for Cementing, Maintains Planned P&A Operations

Completions, Real Result, Weatherford World

Dec 04
2024
ForeSite® Edge Boosts Production, Reduces Failures 8%, Increases Incremental Revenue Approximately $670,000 Per Year

Production, Real Result, Weatherford World

Nov 22
2024
I-Wheel™ and Articulating Hole Finder™ Extend the Range of Wireline in Thailand

Formation Evaluation, Real Result, Weatherford World

Nov 22
2024
SMART Sens™ Delivers Plug Setting Assurance in Multi-Stage Completion Well

Formation Evaluation, Real Result

Nov 22
2024
I-Wheel™ Tandem Sub Saves 84 Hours Operating Time

Formation Evaluation, Real Result, Weatherford World