Real Results

All real results

Date Name
Aug 09
2023
Raptor® 2.0 Cased-Hole Evaluation System With Tractor Accurately Located Gas Contact, Quantified Saturations in Highly Deviated Well

Formation Evaluation, Real Result, Weatherford World

Aug 02
2023
Memory Raptor® Cased-Hole Evaluation System Logged Wireline-Equivalent Data With Slickline, Reduced Operational Costs by 54%

Formation Evaluation, Real Result, Weatherford World

Jul 28
2023
Modus™ Managed Pressure Wells Solution Mitigated Wellbore Stability Issues, Drilled 18,000-ft Lateral in Single Trip 9 Days Ahead of Plan

Drilling, Real Result, Weatherford World

Jul 17
2023
Red Eye Subsea Water-Cut Meter Reduces Chemical Injection Requirements Saves $2 Million Annual Recycling/Transport OPEX

Production, Real Result, Weatherford World

Jul 13
2023
Red Eye Subsea Water-Cut Meter Simplifies Metering Design, Eliminates MPFMs on 18 Wet-Gas Wells, Saves $12 Million CAPEX

Production, Real Result, Weatherford World

Jun 21
2023
HyperLine™ 250 Motor, Optimized BHA Drilled Challenging Sidetrack in a Single Run, Set New Benchmark for Horizontal Wells in North Iraq

Drilling, Real Result, Weatherford World

Jun 16
2023
ShockWave® Sonic Tool, Neural Network-Generated Density Characterized Reservoir, Detected Faults Without Radioactive Sources

Drilling, Real Result, Weatherford World

Jun 12
2023
Nitrogen Cap Drilling, MPD Techniques Slashed Conventional Water Usage in Half, Conserved 54,000+ Barrels in First Application

Drilling, Real Result, Weatherford World

Jun 02
2023
Firma Plug and Abandonment Solutions Safely Decommissioned 21 Phase III Wells In Turnkey Project with International Operator

Intervention and Abandonment, Real Result, Weatherford World

May 31
2023
Electrically Actuated Motor-Valve (EAMV) Reduces Emissions in Remote Sour-Gas Well, Saves Automation/Controller, $23K Annual OPEX

Production, Real Result, Weatherford World