Jan 30 2023
|
Magnus® RSS Achieved Longest 12 1/4-in. Sidetrack Run in Field to Date, Saved 7 Days of Drilling Time
Drilling, Real Result, Weatherford World
|
|
Jan 25 2023
|
UltraWave® LWD High-Resolution Ultrasonic Imaging Provided Detailed Borehole Acoustic Image, Borehole Shape in OBM With High Solid Content
Formation Evaluation, Real Result, Weatherford World
|
|
Jan 17 2023
|
Integrated Evaluation Solution Provides Full Characterization With Oilfield Tools in Harsh, Geothermal Reservoir Conditions
Formation Evaluation, Real Result, Weatherford World
|
|
Jan 11 2023
|
Xpress™ XT Pressure-Balanced Liner System Enabled Flawless Installation in Challenging Well with Heavy Mud/High-Pressure Circulation and without Premature Activation of Hanger Slips or NPT
Drilling, Real Result, Weatherford World
|
|
Jan 10 2023
|
Managed Pressure Drilling Techniques Cemented Liner Through High-Pressure Salt Section With Narrow Pressure Window, Mitigated Losses
Drilling, Real Result, Weatherford World
|
|
Jan 10 2023
|
Magnus RSS, MFR LWD Technology Maintained Planned Trajectory, Completed Section in One Run, Reduced NPT by 1 Day, Saved $73,000 USD
Drilling, Real Result, Weatherford World
|
|
Jan 04 2023
|
RipTide® RFID Drilling Reamer Selectively Enlarged Salt Dome Interval and Deactivated On Demand, Mitigated Prevalent Stuck Pipe Issues
Drilling, Real Result, Weatherford World
|
|
Jan 04 2023
|
Vero Automated Connection Integrity Service Increased Running Efficiency by 14%, Delivered Zero Rejected Joints, Saved $77,000
Real Result, Tubular Running Services, Weatherford World
|
|
Dec 23 2022
|
Compact™ C-Thru, Interpretation Services Help to Identify Perforation Zones, Reduce Water Cut, and Achieve Production of 1,300 BOPD
Formation Evaluation, Real Result
|
|
Dec 23 2022
|
Raptor® System and Interpretation Services Detect Gas Reserves Behind Casing, Enable 4x Higher Production Than Estimated
Formation Evaluation, Real Result
|
|