Oct 20 2022
|
Vero® Automated Connection Integrity Made Up 3,000 Connections, Saved Over 42 Hours of Rig Time for Major Operator in Deepwater Gulf of Mexico
Real Result, Tubular Running Services, Weatherford World
|
|
Sep 26 2022
|
Firma Plug and Abandonment Solutions Reduced C02 Emissions by 91% in Lump Sum Turnkey Well Decommissioning and Restoration Project
Intervention and Abandonment, Real Result, Weatherford World
|
|
Sep 06 2022
|
Advanced Well Integrity, Reservoir Monitoring Analysis Identified Leak Zones Stemming from Corrosion, Avoided Catastrophic Blowout
Formation Evaluation, Real Result, Weatherford World
|
|
Aug 24 2022
|
Vero Automated Connection Integrity Enabled Casing Running, Testing of Deepwater Well, Reduced Risk Exposure by 50%, and Assured Connection Integrity at 100%
Real Result, Tubular Running Services, Weatherford World
|
|
Aug 23 2022
|
Advanced Logging Tools, Reservoir Analysis Located and Quantified Downhole Sand Production, Minimized ESP Failures
Formation Evaluation, Real Result, Weatherford World
|
|
Aug 02 2022
|
WEL-VERT Drilling-Fluid System Enabled 100% Successful Logging Operation in 76.5 Hours
Drilling, Real Result, Weatherford World
|
|
Jul 15 2022
|
MPD Technology Drilled 2 Million Feet Safely in HPHT Haynesville Unconventional Shale Play, Reached All Planned Targets in Long-Reach Wells
Drilling, Real Result, Weatherford World
|
|
Jul 14 2022
|
Managed Pressure Drilling, Cementing Eliminated Intermediate Contingency Liner in Ultra-Deepwater Well, Saved 5 days, $3.5 Million USD
Drilling, Real Result, Weatherford World
|
|
Jul 07 2022
|
MPD Engineering, Planning, 24-7 Support, Real-Time Engineering Enabled Operator to Build Longest Wells Drilled in Canada
Drilling, Real Result, Weatherford World
|
|
Jun 21 2022
|
Managed Pressure Drilling Performed Regulator-Approved Dynamic Pore Pressure Test in Deepwater Exploration Well, Redefined Future Well Design
Drilling, Real Result, Weatherford World
|
|