|
Sep 19 2023
|
Raptor™ 2.0 Cased-Hole Evaluation System, HPLT Services Identified Source High GOR, Computed Formation Gas Saturation in Horizontal Oil Producer
Formation Evaluation, Real Result, Weatherford World
|
|
|
Sep 05 2023
|
RipTide® Tandem Reamer, Magnus® RSS Drilled, Enlarged Section of Well and Rathole Killer, Saved 40 Hours Rig Time
Drilling, Real Result, Weatherford World
|
|
|
Sep 05 2023
|
GAPS® Service, Temperature Logging Identified Sources of Sustained Annulus Pressure in a Deviated Wellbore, Optimized Remedial Action
Formation Evaluation, Real Result, Weatherford World
|
|
|
Aug 15 2023
|
Raptor® 2.0 Cased-Hole Evaluation System Determined Saturation in New Well Without Openhole Data in Less Than 12 Hours, Maintained Schedule
Formation Evaluation, Real Result, Weatherford World
|
|
|
Aug 15 2023
|
Coiled-Tubing-Conveyed Wireline Technology Acquired Critical Openhole Data in Three Slim,High DLS Wells, Offshore Norway
Formation Evaluation, Real Result, Weatherford World
|
|
|
Aug 09 2023
|
Raptor® 2.0 Cased-Hole Evaluation System With Tractor Accurately Located Gas Contact, Quantified Saturations in Highly Deviated Well
Formation Evaluation, Real Result, Weatherford World
|
|
|
Aug 02 2023
|
Memory Raptor® Cased-Hole Evaluation System Logged Wireline-Equivalent Data With Slickline, Reduced Operational Costs by 54%
Formation Evaluation, Real Result, Weatherford World
|
|
|
Jul 28 2023
|
Modus™ Managed Pressure Wells Solution Mitigated Wellbore Stability Issues, Drilled 18,000-ft Lateral in Single Trip 9 Days Ahead of Plan
Drilling, Real Result, Weatherford World
|
|
|
Jul 17 2023
|
Red Eye Subsea Water-Cut Meter Reduces Chemical Injection Requirements Saves $2 Million Annual Recycling/Transport OPEX
Production, Real Result, Weatherford World
|
|
|
Jul 13 2023
|
Red Eye Subsea Water-Cut Meter Simplifies Metering Design, Eliminates MPFMs on 18 Wet-Gas Wells, Saves $12 Million CAPEX
Production, Real Result, Weatherford World
|
|