Real Results

All real results

Date Name
Sep 20
2021
Innovative Perf and Plug System Saves More Than $800,000 by Recovering OBM and Setting Environmental Plugs in 1 Trip

Intervention and Abandonment, Real Result, Weatherford World

Sep 02
2021
Magnus® RSS Achieves a Central North Sea First by Drilling 17 1/2-in. Hole to Hod Formation in 1 Run

Drilling, Offshore, Real Result, Weatherford World

Aug 30
2021
Magnus® RSS and Quad-Combo LWD Technology Exceed Planned ROP by 40%, Save 5 Days’ Rig Time

Conventional, Drilling, Offshore, Real Result, Weatherford World

Aug 19
2021
Firma™ Solution Including Custom Cutting Tool Cuts 27 Cemented Platform Well Conductors in a Batch Process Taking Only 10 Days

Real Result, Weatherford World

Aug 18
2021
Weatherford and Ardyne Technologies Deliver Innovative Casing-Recovery Solution for Fewer POB, Less CO2 Emissions, More Efficiency

Intervention and Abandonment, Real Result, Weatherford World

Aug 17
2021
Integrated Solution and Centro™ Platform Deliver Well 62 Faster With 32 More Production

Conventional, Deepwater, Drilling, Real Result, Unconventional, Weatherford World

Aug 05
2021
Fat Boy® PCP with Top-Tier System Increase MTBF from 55 to 370 Days, Decrease OPEX by 84%, Saves $2 Million in 9 Sand-Bearing Wells

Production, Real Result, Weatherford World

Aug 05
2021
ForeSite® Edge Boosts Production, Reduces Wellsite Visits 70%, Maintains Pump Fillage Above 70%, Increases Revenue $40K

Production, Real Result, Weatherford World

Aug 05
2021
Rod-Lift Solutions, Maximizer® Pumping Units Reduced OPEX 16% and Workover Costs 75% within Failure-Prone, 100-Well ESP Asset

Production, Real Result, Weatherford World

Aug 05
2021
Rod-Lift Solutions, Maximizer® Pumping Units Reduced OPEX 16% and Workover Costs 75% within Failure-Prone, 100-Well ESP Asset

Production