Real Results

All real results

Date Name
Jan 10
2023
Managed Pressure Drilling Techniques Cemented Liner Through High-Pressure Salt Section With Narrow Pressure Window, Mitigated Losses

Drilling, Real Result, Weatherford World

Jan 10
2023
Magnus RSS, MFR LWD Technology Maintained Planned Trajectory, Completed Section in One Run, Reduced NPT by 1 Day, Saved $73,000 USD

Drilling, Real Result, Weatherford World

Jan 04
2023
RipTide® RFID Drilling Reamer Selectively Enlarged Salt Dome Interval and Deactivated On Demand, Mitigated Prevalent Stuck Pipe Issues

Drilling, Real Result, Weatherford World

Jan 04
2023
Vero Automated Connection Integrity Service Increased Running Efficiency by 14%, Delivered Zero Rejected Joints, Saved $77,000

Real Result, Tubular Running Services, Weatherford World

Dec 23
2022
Compact™ C-Thru, Interpretation Services Help to Identify Perforation Zones, Reduce Water Cut, and Achieve Production of 1,300 BOPD

Formation Evaluation, Real Result

Dec 23
2022
Raptor® System and Interpretation Services Detect Gas Reserves Behind Casing, Enable 4x Higher Production Than Estimated

Formation Evaluation, Real Result

Dec 23
2022
Renaissance® WDCL Safety Valve System Saves Inoperable Well and $14 Million in Rig OPEX, Restores Production of 2,000 bbl per Day

Intervention and Abandonment, Real Result, Weatherford World

Dec 23
2022
WidePak™ Straddle Packer System Restored Well Integrity in Four Corroded Wells, Saved $20 Million in Workover Costs

Intervention and Abandonment, Real Result, Weatherford World

Dec 23
2022
WidePak™ Straddle Packer System Provides Water-Shut-Off Solutions in Gas Well Reduces Water Cut 30%, Increases Production 300% Riglessly Installed in 24 Hours with Zero Incidents

Real Result, Weatherford World

Dec 07
2022
Underbalanced Workover Removed Scale from Environmentally Sensitive Geothermal Well, Enabled Submersible Pump to Recover Geothermal Water

Drilling, Real Result, Weatherford World