Real Results

All real results

Date Name
Jun 09
2021
Magnus® Rotary Steerable System Achieves Drilling Record in North Sea Chalk Formations

Drilling, Real Result, Weatherford World

Jun 09
2021
Motorized Magnus® RSS Sets Performance Benchmark With 25% ROP Improvement in a Middle Eastern Field

Drilling, Real Result, Weatherford World

Jun 02
2021
ForeSite® Platform Delivers ROI in 2 Months, Reduces Downtime 30%, Increases Production 2% In 111 Mature Wells

Production, Real Result, Weatherford World

May 27
2021
Integrated Solution and Centro Platform Deliver Well 62 Faster With 32 More Production

Drilling, Real Result, Weatherford World

May 26
2021
ForeSite® Edge Boosts Production 6%, Reduces Wellsite Visits 70%, Reduces Failures 15%, Increases Revenue $200K per Year

Production, Real Result, Weatherford World

May 07
2021
Magnus® Rotary Steerable System Delivers 6-In. Section in 1 Run, Saves 9 Days of Drilling Time

Drilling, Real Result, Weatherford World

Apr 15
2021
SecureView® Service Saves $300,000 in Casing Repairs by Pinpointing a Casing Leakand Locating the Top of the Cement

Real Result, Unconventional, Weatherford World

Apr 15
2021
WidePak Deep Gas Lift System Increases Production of Offshore Oil Well by More Than 500

Completions, Real Result, Weatherford World

Mar 29
2021
Firma™ Abandonment Solution Helps Customer to P&A 13 North Sea Wells and Save 125 Days Worth $35 Million

Intervention and Abandonment, Real Result, Weatherford World

Mar 29
2021
Firma™ Abandonment Solution Helps Kill, Plug 10 Wells in 234 Days, Saves Operator $10.8 Million in Gulf of Mexico

Aging Reservoirs, Conventional, Deepwater, Intervention and Abandonment, Real Result, Weatherford World