Real Results

All real results

Date Name
Oct 25
2021
Single Trip Completion and Stimulation Delivers $1 Million in Rig Time Savings and 5 Days of Early Production

Completions, Real Result, Weatherford World

Oct 08
2021
Wireline Solution Saves $300,000 by Freeing Stuck Pipe Without Explosives in Geothermal Well

Formation Evaluation, Real Result, Weatherford World

Sep 28
2021
Firma™ Abandonment Solution Delivers 64 Wells 44 Ahead of AFE in Pilot Project for Major Operator

Intervention and Abandonment, Real Result, Weatherford World

Sep 20
2021
Innovative Perf and Plug System Saves More Than $800,000 by Recovering OBM and Setting Environmental Plugs in 1 Trip

Intervention and Abandonment, Real Result, Weatherford World

Sep 02
2021
Magnus® RSS Achieves a Central North Sea First by Drilling 17 1/2-in. Hole to Hod Formation in 1 Run

Drilling, Offshore, Real Result, Weatherford World

Aug 30
2021
Magnus® RSS and Quad-Combo LWD Technology Exceed Planned ROP by 40%, Save 5 Days’ Rig Time

Conventional, Drilling, Offshore, Real Result, Weatherford World

Aug 19
2021
Firma™ Solution Including Custom Cutting Tool Cuts 27 Cemented Platform Well Conductors in a Batch Process Taking Only 10 Days

Real Result, Weatherford World

Aug 18
2021
Weatherford and Ardyne Technologies Deliver Innovative Casing-Recovery Solution for Fewer POB, Less CO2 Emissions, More Efficiency

Intervention and Abandonment, Real Result, Weatherford World

Aug 17
2021
Integrated Solution and Centro™ Platform Deliver Well 62 Faster With 32 More Production

Conventional, Deepwater, Drilling, Real Result, Unconventional, Weatherford World

Aug 05
2021
Fat Boy® PCP with Top-Tier System Increase MTBF from 55 to 370 Days, Decrease OPEX by 84%, Saves $2 Million in 9 Sand-Bearing Wells

Production, Real Result, Weatherford World