Mar 27 2020
|
ForeSite® Production Optimization Platform Drives $17.7M in Annual Incremental Value Through Improved Efficiency, Uptime, and Production
Production, Real Result, Weatherford World
|
|
Mar 20 2020
|
Integrated Completion Solution Saves 27+ Hours of Deepwater Rig Time in Santos Basin, Offshore Brazil
Completions, Real Result, Weatherford World
|
|
Mar 18 2020
|
Victus™Intelligent MPD Helps Major Operator to Reach Targets and Save $90 Million in 6 Wells
Drilling, Real Result, Weatherford World
|
|
Mar 12 2020
|
ForeSite® Production Optimization Platform Boosts Production by 5% During Phase-1 Rollout, Realizes $3.25 Million Per Year in Incremental Revenue
Production, Real Result, Weatherford World
|
|
Mar 03 2020
|
RipTide® RFID Drilling Reamer Successfully Enlarges Wellbore in Deepwater Sidetrack Well Without Incident or Delay
Aging Reservoirs, Completions, Deepwater, Drilling, Real Result, Unconventional, Weatherford World
|
|
Mar 03 2020
|
RipTide® RFID Drilling Reamer Enlarges Wellbore, Saves 2 Days of Rig Time Valued at $220,000
Aging Reservoirs, Completions, Deepwater, Drilling, Real Result, Unconventional, Weatherford World
|
|
Mar 03 2020
|
RipTide® RFID Drilling Reamer and Stabilizer Successfully Enlarge Wellbore, Reduce Time and Related Costs During Technological Test
Aging Reservoirs, Completions, Conventional, Deepwater, Drilling, Real Result, Unconventional, Weatherford World
|
|
Mar 03 2020
|
OptiBarrier Ball Valve Cuts Valve Opening Timeby Half on Ultra Deepwater Stimulation Job
Aging Reservoirs, Completions, Deepwater, Real Result, Unconventional, Weatherford World
|
|
Mar 03 2020
|
RipTide RFID Drilling Reamer Helps to Save 20 Hours of Rig Time Valued at $453,000
Aging Reservoirs, Completions, Deepwater, Drilling, Real Result, Unconventional, Weatherford World
|
|
Mar 02 2020
|
Production Optimization Software Platform Optimizes 1,700 ESP-Lifted Wells. Reduces Downtime by 30%, Boost Production by 2,000 B/D
Production, Real Result, Weatherford World
|
|