Real Results

All real results

Date Name
Mar 27
2020
ForeSite® Production Optimization Platform Drives $17.7M in Annual Incremental Value Through Improved Efficiency, Uptime, and Production

Production, Real Result, Weatherford World

Mar 20
2020
Integrated Completion Solution Saves 27+ Hours of Deepwater Rig Time in Santos Basin, Offshore Brazil

Completions, Real Result, Weatherford World

Mar 18
2020
Victus™Intelligent MPD Helps Major Operator to Reach Targets and Save $90 Million in 6 Wells

Drilling, Real Result, Weatherford World

Mar 12
2020
ForeSite® Production Optimization Platform Boosts Production by 5% During Phase-1 Rollout, Realizes $3.25 Million Per Year in Incremental Revenue

Production, Real Result, Weatherford World

Mar 03
2020
RipTide® RFID Drilling Reamer Successfully Enlarges Wellbore in Deepwater Sidetrack Well Without Incident or Delay

Aging Reservoirs, Completions, Deepwater, Drilling, Real Result, Unconventional, Weatherford World

Mar 03
2020
RipTide® RFID Drilling Reamer Enlarges Wellbore, Saves 2 Days of Rig Time Valued at $220,000

Aging Reservoirs, Completions, Deepwater, Drilling, Real Result, Unconventional, Weatherford World

Mar 03
2020
RipTide® RFID Drilling Reamer and Stabilizer Successfully Enlarge Wellbore, Reduce Time and Related Costs During Technological Test

Aging Reservoirs, Completions, Conventional, Deepwater, Drilling, Real Result, Unconventional, Weatherford World

Mar 03
2020
OptiBarrier Ball Valve Cuts Valve Opening Timeby Half on Ultra Deepwater Stimulation Job

Aging Reservoirs, Completions, Deepwater, Real Result, Unconventional, Weatherford World

Mar 03
2020
RipTide RFID Drilling Reamer Helps to Save 20 Hours of Rig Time Valued at $453,000

Aging Reservoirs, Completions, Deepwater, Drilling, Real Result, Unconventional, Weatherford World

Mar 02
2020
Production Optimization Software Platform Optimizes 1,700 ESP-Lifted Wells. Reduces Downtime by 30%, Boost Production by 2,000 B/D

Production, Real Result, Weatherford World