Real Results

All real results

Date Name
Aug 01
2017
Low-Volume PL-III Pump Doubles Liquid Production, Increases Gas Production from Between 15 and 20 mcfd to More Than 200 mcfd

Aging Reservoirs, Conventional, Production, Real Result, Unconventional

Aug 01
2017
Hydraulic Jet Pump Achieves Target Production Rate of 5,000 bopd within a Five-Day Test

Aging Reservoirs, Conventional, Production, Real Result, Unconventional

Jul 31
2017
Wireline-Retrievable BK-MSD Shear-Down Latch Eliminates Gas-Lift Problem, Increases Revenue by $8.76 Million

Completions, Real Result

Jul 31
2017
Subsurface Safety Valve Saves the Day after Barge Collision, Leads to Valve Installations throughout the Field

Completions, Real Result

Jul 25
2017
LWD Services Deliver Quality Data and TD in an HTHP Deepwater Well With 28,000 psi and 290°F Conditions

Formation Evaluation, Real Result

Jul 25
2017
Testing and Production Services Builds Extended Well Test Facility in Just 3 Weeks, Accelerates Production in Remote H2S-Bearing Field

Formation Evaluation, Real Result

Jul 25
2017
Compact™ Thru Drillpipe Tools and Testers Provide Complete Well Characterization Despite Washouts and 48° Deviation, Save 60 Hr of Rig Time

Formation Evaluation, Real Result

Jul 25
2017
Raptor System Delivers Accurate Saturation Data in >80 Wells, Optimizes Production Strategy For Water-Flood Project

Formation Evaluation, Real Result

Jul 21
2017
At-Bit Measurement System Reached TD in Basal Sand Well with Zero NPT, Reduced Sliding Rate from 55% to 32.5%

Formation Evaluation, Real Result, Weatherford World

Jun 28
2017
BlackCat Retrievable Sealbore Packer Enables Rigless Installation of Velocity String and Saves $200,000 Per Future Intervention

Intervention and Abandonment, Real Result, Weatherford World