Real Results

All real results

Date Name
Jun 12
2017
Plunger-Lift System with WellPilot® Controller Increases Gas and Condensate Production 43 to 50%, Reduces Cost by $52,300 Per Year

Production, Real Result, Weatherford World

Mar 13
2017
Endura® Dual-String Section Mill Deployed Offshore for First Time to Provide Rock-to-Rock Cement Barrier, Saves $1.88 Million in Rig Time

Aging Reservoirs, Conventional, Deepwater, Intervention and Abandonment, Real Result, Weatherford World

Mar 01
2017
DwC System with Defyer® DPA Casing Bit Sets 24-in. Conductor Casing to Section Depth and Covers Loss Zones With Zero Issues

Real Result, Tubular Running Services, Weatherford World

Mar 01
2017
DuraSeal® 301P Pressurized Stuffing Box Provides Intervention-Free Operations for 478 Days

Aging Reservoirs, Conventional, Production, Real Result, Unconventional, Weatherford World

Feb 28
2017
MetalSkin® Monobore Openhole Liner, SurgeMaster® II System Extend 13 38-in. Casing to New Pay Zone, Increase Productive Life of Ultra-Deepwater Facility

Drilling, Real Result, Weatherford World

Feb 17
2017
OverDrive™ System with TorkDrive™ Compact Tool Runs 280 Connections in 1 Trip, Saves 12 Hours of Rig Time

Real Result, Tubular Running Services, Weatherford World

Feb 09
2017
Smart Gas Lift Decreases Gas Injection Volumes by up to 50%, Improves Production in a Mature Field

Production, Real Result, Weatherford World

Feb 06
2017
RipTide® RFID Drilling Reamer and Rathole Killer Enable a Dual-Reamer Solution that Drills to TD, Eliminates Rathole, Saves $1.57 Million in Deepwater Well

Deepwater, Drilling, Real Result, Weatherford World

Feb 02
2017
OverDrive™ and DwC Systems Drill a Record-Breaking Interval, Save Client 4.7 Days of Rig Time

Real Result, Tubular Running Services, Weatherford World

Jan 25
2017
Weatherford Premium Hydraulic-Rotating Liner Hanger System Reaches TD in Weak Formation with Zero Losses and Saves 7 Hours of Rig Time

Drilling, Real Result, Weatherford World