Real Results

All real results

Date Name
Oct 12
2017
Compact™ Wireline Tools, Laboratory Services Characterize Unconsolidated Sandstone Well, Enable 20% Decrease in Sand Production

Formation Evaluation, Real Result

Sep 15
2017
Two Extended-Reach Liner-Hanger Systems Set New Zealand Records, Maximize Onshore Gas Production

Drilling, Real Result

Sep 15
2017
Landing Collar Insert Facilitates Installation and Drillout, Saves 8 Weeks of Lead Time and $400,000

Drilling, Real Result

Aug 02
2017
Renaissance™ System Retrofits Well With Chemical Injection System, Removes Asphaltene Deposits, Maintains SCSSV Functionality

Intervention and Abandonment, Real Result

Aug 01
2017
Low-Volume PL-III Pump Doubles Liquid Production, Increases Gas Production from Between 15 and 20 mcfd to More Than 200 mcfd

Aging Reservoirs, Conventional, Production, Real Result, Unconventional

Aug 01
2017
Hydraulic Jet Pump Achieves Target Production Rate of 5,000 bopd within a Five-Day Test

Aging Reservoirs, Conventional, Production, Real Result, Unconventional

Jul 31
2017
Wireline-Retrievable BK-MSD Shear-Down Latch Eliminates Gas-Lift Problem, Increases Revenue by $8.76 Million

Completions, Real Result

Jul 31
2017
Subsurface Safety Valve Saves the Day after Barge Collision, Leads to Valve Installations throughout the Field

Completions, Real Result

Jul 25
2017
LWD Services Deliver Quality Data and TD in an HTHP Deepwater Well With 28,000 psi and 290°F Conditions

Formation Evaluation, Real Result

Jul 25
2017
Testing and Production Services Builds Extended Well Test Facility in Just 3 Weeks, Accelerates Production in Remote H2S-Bearing Field

Formation Evaluation, Real Result