Real Results

All real results

Date Name
Jul 11
2016
DwC System with Defyer® DPA Bit Sets Casing at TD, Saves 1 Day of Rig Time in Unstable Formation

Real Result, Tubular Running Services, Weatherford World

Jul 08
2016
Compact™ Logging Tools Acquire Data in 3.83-in. Well With Unique Logging-While-Coring Approach

Conventional, Formation Evaluation, Real Result, Weatherford World

Jul 01
2016
Alpha VSRD Multiphase Meter Improves Well Test Accuracy and Frequency, Reduces Downtime and Costs

Production, Real Result, Unconventional, Weatherford World

Jun 30
2016
LWD Services Maintains 100% Contact in Difficult Section, Saves $500k Sidetrack Job

Conventional, Drilling, Real Result, Weatherford World

Jun 29
2016
FrontLine™ Motor with HyperPulse™ MWD System Sidetracks J-Type Well, Saves 2 Days of Rig Time

Drilling, Real Result, Unconventional, Weatherford World

Jun 13
2016
Plunger-Lift System Restores Production in Previously Abandoned Gas-Condensate Well

Aging Reservoirs, Conventional, Production, Real Result, Weatherford World

Jun 07
2016
Real-Time LWD and Advanced Gas Analysis Data Improves Reservoir Characterization and Reduces Costs

Drilling, Real Result, Unconventional, Weatherford World

Jun 06
2016
HyperLine™ Motor and TwinWells™ System Place SAGD Wells at Required 16- to 20-ft Distance in 4.7 Days

Conventional, Drilling, Real Result, Weatherford World

Jun 06
2016
AutoCLAMP™ System Eliminates Manual Handling, Improves Run Rates, Saves 8 Hours on Offshore Well

Real Result, Tubular Running Services, Weatherford World

Jun 02
2016
PCP Model 16-3000 Operates Trouble-Free for 10 Years, Saves $57,251 in Intervention Costs

Aging Reservoirs, Conventional, Production, Real Result, Unconventional, Weatherford World