Real Results

All real results

Date Name
Jun 02
2016
PCP Model 16-3000 Operates Trouble-Free for 10 Years, Saves $57,251 in Intervention Costs

Aging Reservoirs, Conventional, Production, Real Result, Unconventional, Weatherford World

Jun 02
2016
Compact™ Well Shuttle Enables Formation Evaluation in Well Suffering Total Losses

Conventional, Formation Evaluation, Real Result, Weatherford World

Jun 01
2016
World’s First Subsurface, RFID-Enabled Reverse Cementing System Is Successfully Implemented for a Liner Installation

Drilling, Real Result, Weatherford World

May 27
2016
COROD® MER Continuous Sucker Rod Increases Average Run Life Of Rod Strings By 51% In Six Highly Corrosive Wells

Aging Reservoirs, Conventional, Production, Real Result, Unconventional, Weatherford World

May 26
2016
DwC™ System With Defyer® DPA Bit Drills and Cases 2 Continuous Sections to TD, Saves 5 Days of Rig Time

Real Result, Tubular Running Services, Weatherford World

May 20
2016
AutoCLAMP™ System and RCS-500 Completion Slips Prevent Control Line Damage, Enhance Rig Safety, and Eliminate NPT in Ultradeepwater Well

Real Result, Tubular Running Services, Weatherford World

May 20
2016
Fat Boy® PCP Model 52 Exceeds MTBF Rate by 400%, Saves $260,681 in Intervention Costs

Aging Reservoirs, Conventional, Production, Real Result, Weatherford World

May 17
2016
SpectralWave® Sensor Delivers High-Quality Data To Drill 91° Lateral Within Pay Zone in One Run

Conventional, Drilling, Real Result, Weatherford World

May 16
2016
Plug Locator System Avoids a Wet Shoe For Proper Cementing Across Salt Layer, Saves 3 Days of Rig Time

Drilling, Real Result, Weatherford World

May 16
2016
QuickCut™ System, FloReg™ ICD Enable Record Setting Openhole Sand Screen Completion

Aging Reservoirs, Conventional, Intervention and Abandonment, Real Result, Weatherford World