Real Results

All real results

Date Name
Jun 18
2025
TwinWells™ Ranging System, HyperLine™ Motor Drill 4,400-ft SAGD Injector Lateral in 7.75 Hours

Drilling, Real Result, Weatherford World

May 30
2025
WCGB-300 Latex Powder Enhances Gas Migration Control, Ensures Good Cement Bonding in Debut Deployment, Enhances Long-Term Well Stability

Completions, Real Result, Weatherford World

May 30
2025
Compact™ Microimager Tool Unlocks Stratigraphic and Structural Features in Horizontal Coal Seams, Results Help Evaluate Borehole Stability

Formation Evaluation, Real Result, Weatherford World

May 29
2025
Successful Production Logging Recording While Nitrogen Lifting Via E-Coil Tubing Optimizes Well-Work Plan

Formation Evaluation, Real Result, Weatherford World

May 27
2025
Victus™ Intelligent MPD System Lowers Mud Weight Requirement, Achieves Planned Target Depth, Enables Lateral Extensions

Drilling, Real Result, Weatherford World

May 21
2025
Thru-Tubing Measurement Services Provide Essential Data on Multiple Barriers in Deep Wells, Save $83,000 in Rigless Operation

Formation Evaluation, Real Result, Weatherford World

May 20
2025
SandSure™ Engineered Sand-Control Fluid System Key to Successful Acid Stimulation, Sand Control in Gas Wells, Increases Production by 182%

Completions, Real Result, Weatherford World

May 16
2025
Innovative Combination of PLT, VRC, and SNL Tools Identify Four Phase Flow Profiles in Deviated Well, Normalize Gas and Sand Production

Formation Evaluation, Real Result, Weatherford World

May 15
2025
MPD and PressureWave™ Integrated Solution Evaluate Formation in uHPHT Well in UK, Remove Wireline and Save $963,000

Drilling, Real Result, Weatherford World

May 09
2025
Raptor™ 2.0 Cased-Hole Evaluation System Reveals Reservoir Water Drive Mechanism in Gravel Pack Well Completion

Formation Evaluation, Real Result, Weatherford World