Real Results

All real results

Date Name
Sep 22
2015
OverDrive™ System Boosts Casing-Running Speeds to 9.2 Joints/hr, Reduces Rig Time

Real Result, Tubular Running Services, Weatherford World

Sep 21
2015
Sand Jetting, FracGuard® Plugs Complete Complex Well With Only Coiled-Tubing Unit, Save $300,000

Completions, Real Result, Unconventional, Weatherford World

Sep 16
2015
Red Eye® 2G Water-Cut Meter Proves Reliable in High-Wax, Polymer-Injected Wells

Conventional, Production, Real Result, Weatherford World

Sep 09
2015
Revolution® Heat RSS Saves 2 Days of Rig Time Per Well on Five-Well Project

Drilling, Real Result, Unconventional, Weatherford World

Sep 08
2015
Triple-Combo LWD Package Enables High-Dogleg Sidetrack, Saves 50 Days and $4 Million

Conventional, Drilling, Real Result, Weatherford World

Sep 04
2015
Surge-Reduction Technology and SSR Plug Locator System Help To Run and Cement Four Primary Strings With Zero Losses

Drilling, Real Result, Weatherford World

Sep 04
2015
Tubular Running Services Makes Up 1,905 Compliant Connections on 10 Wells with Zero HSE Incidents

Real Result, Tubular Running Services, Weatherford World

Sep 04
2015
Power Generator Package Reduces Annual Propane Costs by 37.5%

Aging Reservoirs, Conventional, Production, Real Result, Unconventional, Weatherford World

Sep 03
2015
IntegraLine™ Premium Liner System Enables Liner Running to Depth With Zero NPT in Deepwater Well

Drilling, Real Result, Weatherford World

Aug 27
2015
Collaboration and DwL Technology Tame Lost Circulation and Wellbore Instability in the North Sea

Real Result, Tubular Running Services, Weatherford World