Real Results

All real results

Date Name
Aug 26
2015
Revolution® Core RSS Drills Challenging Well 7 Days Early and $700,000 Ahead of AFE

Drilling, Real Result, Unconventional, Weatherford World

Aug 07
2015
Riser- and Tong-Handling Systems Decommission High-Torque Drilling Riser Without NPT or Safety Incidents, Save 2 Days of Rig Time and $2 Million

Real Result, Tubular Running Services, Weatherford World

Aug 03
2015
Nonretrievable DwC™ System Drills Unstable Formation, Sets 20-in. Casing in One Run

Real Result, Tubular Running Services, Weatherford World

Jul 31
2015
QuickCut™ Casing-Exit Systems in Expandable-Liner Assemblies Provide One-Trip Multilateral Solution

Aging Reservoirs, Conventional, Intervention and Abandonment, Real Result, Weatherford World

Jul 22
2015
High-Torque Liner-Hanger System and Reamer Shoe Enable Running and Securing Liner in One Trip

Drilling, Real Result, Weatherford World

Jul 17
2015
Plug Locator System Saves $2.5 Million in Potential Remedial Cementing Work

Drilling, Real Result, Weatherford World

Jul 17
2015
WRSM Retrievable Cementing Packoff Delivers High-Pressure Performance, Saves Half Day of Rig Time

Drilling, Real Result, Weatherford World

Jul 16
2015
Revolution® RSS, ShockWave® tool Drill Section in Single-Bit Run, Put Job 10 Days Ahead of Plan in First Deepwater Offshore Use in Brazil

Deepwater, Drilling, Real Result, Weatherford World

Jul 16
2015
Revolution® Core RSS, SpectralWave® Sensor, and CrossWave® Tool Log Well Without Wireline; Save 7 Days and $350,000 in Rig Time

Conventional, Drilling, Real Result, Weatherford World

Jul 15
2015
Rig-Free® Light-Duty Unit Abandons 6 Offshore Wells and Saves 3.5 Days of Rig Time

Aging Reservoirs, Conventional, Deepwater, Intervention and Abandonment, Real Result, Weatherford World