Real Results

All real results

Date Name
May 19
2015
DwC™ System and Defyer™ DPA Casing Bit Mitigate Lost Circulation, Save Operator 15 Days Valued at $982,659

Real Result, Tubular Running Services, Weatherford World

May 19
2015
S-88 Sucker Rods Reduce RodFailure Rate in 11 Wells by 63%, Increase Oil Production by 13%

Aging Reservoirs, Conventional, Production, Real Result, Unconventional, Weatherford World

May 14
2015
Defyer® DPA Casing Bit Speeds Up Drillout of Composite Bridge Plug

Real Result, Tubular Running Services, Weatherford World

May 12
2015
Inflatable Retrievable Bridge Plug Stops Water Production, Enables More than $2 Million in Hydrocarbon Production

Conventional, Intervention and Abandonment, Real Result, Weatherford World

May 11
2015
OneTrip StarBurst™ Multilateral System Accesses New Reservoir Targets in 4 Wells, Cuts Rig Time by 50%, and Avoids Cost of New Platform

Aging Reservoirs, Conventional, Drilling, Real Result, Weatherford World

May 11
2015
Tubular Management Services Manage Pipe Inventory, Save $50,000 For Every Recording Error Avoided

Real Result, Tubular Running Services, Weatherford World

May 11
2015
Hands-Free System Makes Up and Racks Casing Without Interrupting Drilling, Reduces Casing Running Time and Drilling Floor Hazards

Real Result, Tubular Running Services, Weatherford World

May 11
2015
Rotating Full-Bore Cement Head Reduces Surface Casing NPT by 6+ Hours in a North Sea Well

Real Result, Tubular Running Services, Weatherford World

May 04
2015
Coiled Tubing and Cyclone Bailer® Tool Clear >800-Ft Obstructions and Help to Restore Production from 0 to 700 BPD in 4 Wells

Intervention and Abandonment, Real Result, Unconventional, Weatherford World

Apr 24
2015
Critical Velocity Reduction System Unloads Liquid From Vertical Gas Wells Perforated in Long Intervals, Redefines the Decline Curve

Conventional, Production, Real Result, Unconventional, Weatherford World