Real Results

All real results

Date Name
Feb 24
2014
Europe’s Longest Homco® Casing Patch Restores and Isolates 60-ft Interval Within 24 Hours

Aging Reservoirs, Conventional, Intervention and Abandonment, Real Result, Weatherford World

Feb 24
2014
MetalSkin® Cased-Hole Liner Isolates Perforations, Maximizes Hole Size to Optimize Production in Existing Well

Aging Reservoirs, Conventional, Intervention and Abandonment, Real Result, Weatherford World

Feb 11
2014
TorkWrench™ 10-100 Iron Roughneck and PowerArm 2.1 Device Enhance Rig Safety, Improve Efficiency

Real Result, Tubular Running Services, Weatherford World

Feb 10
2014
Weatherford Well-Testing Services Optimize Flow Process to Provide High-Quality Real-Time Data, Maximizing Operational Efficiency

Aging Reservoirs, Conventional, Formation Evaluation, Real Result, Unconventional, Weatherford World

Jan 29
2014
TorkDrive™ Compact ICT Fixes Leakage Problem in Casing String, Saves Costs of Pulling, Re-Running Additional Casing

Real Result, Tubular Running Services, Weatherford World

Jan 17
2014
Thru-Tubing Gas-Lift Straddle Diverts Gas Lift Deeper in Wellbore, Revives, Enhances Productivity on Well Killed by Water Coning

Conventional, Intervention and Abandonment, Real Result, Weatherford World

Jan 17
2014
WidePak™ LE Gas-Lift System Relieves Back Pressure, Liquid Loading, Revives Well, Enhances Safety With Small Crew

Conventional, Intervention and Abandonment, Real Result, Weatherford World

Jan 17
2014
CTD® Motor, Hydraulic Tubing Cutter, MacFlow™ Software Cut Tubing Near TD

Conventional, Intervention and Abandonment, Real Result, Weatherford World

Jan 08
2014
Custom-Designed MetalSkin™ Cased-Hole Liner Systems Isolate Existing Perforations While Producing Lower Zones

Aging Reservoirs, Conventional, Intervention and Abandonment, Real Result, Unconventional, Weatherford World

Dec 17
2013
Compact™ Cross-Dipole Tool Evaluates Hydraulic Fracture Treatment, Optimizes Future Well Completions

Formation Evaluation, Real Result, Weatherford World