|
May 21 2025
|
Thru-Tubing Measurement Services Provide Essential Data on Multiple Barriers in Deep Wells, Save $83,000 in Rigless Operation
Formation Evaluation, Real Result, Weatherford World
|
|
|
May 20 2025
|
SandSure™ Engineered Sand-Control Fluid System Key to Successful Acid Stimulation, Sand Control in Gas Wells, Increases Production by 182%
Completions, Real Result, Weatherford World
|
|
|
May 16 2025
|
Innovative Combination of PLT, VRC, and SNL Tools Identify Four Phase Flow Profiles in Deviated Well, Normalize Gas and Sand Production
Formation Evaluation, Real Result, Weatherford World
|
|
|
May 15 2025
|
MPD and PressureWave™ Integrated Solution Evaluate Formation in uHPHT Well in UK, Remove Wireline and Save $963,000
Drilling, Real Result, Weatherford World
|
|
|
May 09 2025
|
Raptor™ 2.0 Cased-Hole Evaluation System Reveals Reservoir Water Drive Mechanism in Gravel Pack Well Completion
Formation Evaluation, Real Result, Weatherford World
|
|
|
May 09 2025
|
Modus™ Managed Pressure Wells Solution Minimizes Fluid Loss on Extended-Reach Well, Saves Operator Over $1.2 Million USD
Drilling, Real Result, Weatherford World
|
|
|
May 09 2025
|
Unique Combination of Logging Tools Identify Casing Leak, Source of Water Production, Enable Successful Workover
Formation Evaluation, Real Result, Weatherford World
|
|
|
May 08 2025
|
Advanced Multiconductor Jar Activates Two Openhole Coring Runs, Prevents Stuck Logging Tools and Costly Fishing Operation, Minimizes NPT
Formation Evaluation, Real Result, Weatherford World
|
|
|
May 08 2025
|
COROD® Continuous Rod in Sandy, High DLS Well Reduces CAPEX 25%, Lowers Connected HP 40%, and Pumps 13K BBL/$1.3M without Intervention
Production, Real Result, Weatherford World
|
|
|
May 02 2025
|
Integrated Subsea Completion, Wellbore Cleanup Solution In the UK North Sea Reduces CO2 by 75%
Completions, Real Result, Weatherford World
|
|