Real Results

All real results

Date Name
Nov 21
2011
ComboFrac™ Packers Combine Mechanical, Swellable Isolation, Complete Well in One Trip, Save Rig Costs

Completions, Deepwater, Real Result, Weatherford World

Nov 18
2011
Insert Progressing Cavity Pump Significantly Reduces Downtime, Rig Costs in Oman

Aging Reservoirs, Conventional, Production, Real Result, Weatherford World

Nov 09
2011
GENISIS® Hybrid Swellable Packer Eliminates Saltwater Intrusion Using Drilling Fluid, Saving Disposal Costs and Rig Time

Completions, Deepwater, Real Result, Weatherford World

Nov 05
2011
ZoneSelect™ System Isolates, Fractures 15 Zones After Year-Long Hiatus, Proves Durability, Avoids Costly Well Recompletion

Completions, Deepwater, Real Result, Weatherford World

Nov 04
2011
Weatherford, Sumitomo Collaborate, Design New Threaded Tubular Makeup/Breakout System, Set Record Torque Value of 375,000 ft-lb

Real Result, Tubular Running Services, Weatherford World

Nov 04
2011
DwC™ Technology, Defyer™ Bit Enable Operator to Drill Through Formation with Hard Stringers, Set Surface Casing in One Trip

Real Result, Tubular Running Services, Weatherford World

Nov 01
2011
DwC™ Technology, Defyer™ Bits Establish New Drilling Standards, Enable Operator to Save Significant Rig Time, Costs

Real Result, Tubular Running Services, Weatherford World

Oct 24
2011
Fraxsis® Annulus Swellable Packers Isolate 28 Zones for Fracturing Operations in Difficult Bakken Shale Play

Completions, Deepwater, Real Result, Weatherford World

Oct 14
2011
ZoneSelect™ System, FSV Shifting Tool Isolate, Stimulate Four Zones Through Tight Restriction, Increase Production with No Lost Time

Completions, Deepwater, Real Result, Weatherford World

Oct 14
2011
ZoneSelect™ System, Fraxsis® and BULLDOG™ Packers Cement Upper Casing, Isolate 16 Zones, Save 10 Days Rig Time

Completions, Deepwater, Real Result, Weatherford World