Real Results

All real results

Date Name
May 04
2010
MORPHISIS® ASPs Isolate Critical Water Contact Zones in Onshore Redevelopment Well to Reduce Costs and Improve Efficiency

Completions, Deepwater, Real Result, Weatherford World

Mar 31
2010
Renaissance™ WDCLP System Enables Shell UK to Avoid Costly Workover on North Sea Well for Savings of £5 Million

Aging Reservoirs, Intervention and Abandonment, Real Result, Weatherford World

Mar 25
2010
QuickCut™ System with MultiCatch™ Anchor Sidetracks Through High-Collapse Casing, Saves Rig Time and Costs in Argentina

Aging Reservoirs, Conventional, Intervention and Abandonment, Real Result, Weatherford World

Mar 22
2010
Screw-in Whipstock Enables Sidetracking of Mexican Geothermal Well without Need for Cement Plug

Aging Reservoirs, Conventional, Intervention and Abandonment, Real Result, Unconventional, Weatherford World

Mar 15
2010
ESS® Sand Screens Maximize Injection Rate and Sand Integrity While Significantly Reducing Completion Rig Time

Completions, Conventional, Real Result, Weatherford World

Mar 12
2010
MacDrill™ Motor Successfully Mills Obstruction in Canadian Thermal Well after Other Attempts Fail

Conventional, Intervention and Abandonment, Real Result, Weatherford World

Mar 05
2010
Quick Rapid-Lock™ Design Customization Reduces BOP Handling Time, Enhances Safety

Drilling, Real Result, Weatherford World

Mar 05
2010
QuickCut™ System Mills Window in One Trip, Saves Operator Rig Time and Costs Offshore Mexico

Aging Reservoirs, Conventional, Intervention and Abandonment, Real Result, Weatherford World

Feb 03
2010
Tubing Cutter Passes Through Narrow Pipe to TD, Successfully Cuts Through Stuck Pipe to Enable Well Completion

Conventional, Intervention and Abandonment, Real Result, Weatherford World

Jan 25
2010
Colombia: MetalSkin® System Seals Off Water-Producing Zone, Enables Optimal Production in 24 Hours

Aging Reservoirs, Conventional, Intervention and Abandonment, Real Result, Weatherford World