|
Nov 04 2011
|
Weatherford, Sumitomo Collaborate, Design New Threaded Tubular Makeup/Breakout System, Set Record Torque Value of 375,000 ft-lb
Real Result, Tubular Running Services, Weatherford World
|
|
|
Nov 04 2011
|
DwC™ Technology, Defyer™ Bit Enable Operator to Drill Through Formation with Hard Stringers, Set Surface Casing in One Trip
Real Result, Tubular Running Services, Weatherford World
|
|
|
Nov 01 2011
|
DwC™ Technology, Defyer™ Bits Establish New Drilling Standards, Enable Operator to Save Significant Rig Time, Costs
Real Result, Tubular Running Services, Weatherford World
|
|
|
Oct 24 2011
|
Fraxsis® Annulus Swellable Packers Isolate 28 Zones for Fracturing Operations in Difficult Bakken Shale Play
Completions, Deepwater, Real Result, Weatherford World
|
|
|
Oct 14 2011
|
ZoneSelect™ System, FSV Shifting Tool Isolate, Stimulate Four Zones Through Tight Restriction, Increase Production with No Lost Time
Completions, Deepwater, Real Result, Weatherford World
|
|
|
Oct 14 2011
|
ZoneSelect™ System, Fraxsis® and BULLDOG™ Packers Cement Upper Casing, Isolate 16 Zones, Save 10 Days Rig Time
Completions, Deepwater, Real Result, Weatherford World
|
|
|
Oct 14 2011
|
DwC™ Technology, Defyer™ Bits Prove Key in Drilling Two Sections, Offshore Malaysia, Enable Operator to Save Significant Rig Time, Costs
Real Result, Tubular Running Services, Weatherford World
|
|
|
Oct 10 2011
|
Offshore Romania: ZoneSelect™ System, Fraxsis®, BlackCat™ Packers Provide Modular Solution that Isolates, Fractures Multiple Zones
Completions, Deepwater, Real Result, Weatherford World
|
|
|
Oct 07 2011
|
DwC™ Technology, Defyer™ Bit Enable Operator to Drill Shallow Gumbo Section, Set Surface Casing Without Incident, Save US$500,000
Real Result, Tubular Running Services, Weatherford World
|
|
|
Sep 22 2011
|
BOPs Shear Large Drillpipe, Meet Legislative Requirements for Offshore Well in Denmark
Drilling, Real Result, Weatherford World
|
|