Real Results

All real results

Date Name
Jul 07
2010
ACP™ Packer and Hydraulic Stage Tool Achieve Critical Liner Cementation in Geothermal Well

Drilling, Real Result, Weatherford World

Jul 07
2010
First Use in China of Latch-in Cementing Plug with Gemoco® Dual Sub-Surface Release™ Cementing Head Reduces Costs

Drilling, Real Result, Weatherford World

Jul 06
2010
Two-Pod Milling System with MillSmart™ Technology Saves Four Days Rig Time, Increases ROP in Mexico

Conventional, Intervention and Abandonment, Real Result, Weatherford World

Jun 25
2010
Expandable Sand Screens (ESS®) Take Production Beyond Expectations for Seven North Sea Wells

Completions, Conventional, Real Result, Weatherford World

Jun 15
2010
First Successful Hydraulic Fracturing Job in Egypt Enables Operator to Develop Tight, Low-Permeability Formation

Completions, Real Result, Unconventional, Weatherford World

May 04
2010
MORPHISIS® ASPs Isolate Critical Water Contact Zones in Onshore Redevelopment Well to Reduce Costs and Improve Efficiency

Completions, Deepwater, Real Result, Weatherford World

Mar 31
2010
Renaissance™ WDCLP System Enables Shell UK to Avoid Costly Workover on North Sea Well for Savings of £5 Million

Aging Reservoirs, Intervention and Abandonment, Real Result, Weatherford World

Mar 25
2010
QuickCut™ System with MultiCatch™ Anchor Sidetracks Through High-Collapse Casing, Saves Rig Time and Costs in Argentina

Aging Reservoirs, Conventional, Intervention and Abandonment, Real Result, Weatherford World

Mar 22
2010
Screw-in Whipstock Enables Sidetracking of Mexican Geothermal Well without Need for Cement Plug

Aging Reservoirs, Conventional, Intervention and Abandonment, Real Result, Unconventional, Weatherford World

Mar 15
2010
ESS® Sand Screens Maximize Injection Rate and Sand Integrity While Significantly Reducing Completion Rig Time

Completions, Conventional, Real Result, Weatherford World