Aug 07 2007
|
9 5/8-in. StarBurst™ Multilateral System Sets at New Depths in ERD Well at Remote Location
Aging Reservoirs, Conventional, Intervention and Abandonment, Real Result, Weatherford World
|
|
Aug 07 2007
|
Successful 7-in. StarBurst™ Multilateral Deployment for Twin-Bore Well Construction
Aging Reservoirs, Conventional, Intervention and Abandonment, Real Result, Weatherford World
|
|
Aug 07 2007
|
Successful Perforation of StarBurst™ Hollow Whipstock for Statoil North Sea Multilateral Well
Aging Reservoirs, Conventional, Intervention and Abandonment, Real Result, Weatherford World
|
|
Aug 03 2007
|
QuickCut™ Casing Exit System Sidetracks Well, Saves Time and Money while Enabling Essential Coring Functions
Aging Reservoirs, Conventional, Intervention and Abandonment, Real Result, Weatherford World
|
|
Jul 17 2007
|
Milling Out Well Obstruction in One Trip, Leaving Completion Undisturbed Saves $11 Million
Conventional, Intervention and Abandonment, Real Result, Weatherford World
|
|
Jun 11 2007
|
ShallowAngle QuickCut™ Casing Exit System Removes Q125 High-Yield Casing in One Trip
Aging Reservoirs, Conventional, Intervention and Abandonment, Real Result, Weatherford World
|
|
Jun 11 2007
|
ShallowAngle QuickCut™ Milling System Tames Hostile Well for a Major Operator in the North Sea
Aging Reservoirs, Conventional, Intervention and Abandonment, Real Result, Weatherford World
|
|
May 10 2007
|
North Sea No Match for Multilateral/Expandable Sand Screen Combination
Aging Reservoirs, Completions, Conventional, Deepwater, Real Result, Weatherford World
|
|
Apr 16 2007
|
StarBurst™ Multilateral System Overcomes Challenges to Create Deep Lateral Junction
Aging Reservoirs, Conventional, Intervention and Abandonment, Real Result, Weatherford World
|
|
Mar 20 2007
|
Cabinda Gulf Oil Company Increases Production by 2,800 BOPD, Performing Stimulation with MasterJet™ Nozzle
Conventional, Intervention and Abandonment, Real Result, Weatherford World
|
|