Real Results

All real results

Date Name
Aug 28
2006
Automatic Water Shutoff Solution Puts Major BP Subsea Well Back on Production, Removes Need for Second Intervention, Saving $5 Million

Conventional, Intervention and Abandonment, Real Result, Weatherford World

Jul 12
2006
Successful Sidetrack Through Hard Formation Saves BP America 25 Days

Aging Reservoirs, Conventional, Intervention and Abandonment, Real Result, Weatherford World

Jun 22
2006
StarBurst™ Multilateral System Enables ChevronTexaco to Commingle Production from Two Separate Reservoir Intervals

Aging Reservoirs, Conventional, Deepwater, Intervention and Abandonment, Real Result, Weatherford World

May 09
2006
Inaugural MillThru™ System Installation Provides Operator with Highest-Producing Multilateral in Field

Aging Reservoirs, Conventional, Intervention and Abandonment, Real Result, Weatherford World

Apr 11
2006
Triple-Zone Selective Gravel Pack Helps South Louisiana Independent Avoid Future Workovers to Save an Estimated $175,000

Completions, Conventional, Real Result, Weatherford World

Feb 28
2006
QuickPack™ Casing Exit System Drives Down Development Cost While Maximizing Reservoir Contact

Aging Reservoirs, Conventional, Intervention and Abandonment, Real Result, Unconventional, Weatherford World

Feb 23
2006
Expandable Sand Screen (ESS®) Overcomes Sand Plugging, High BHT, Severe Corrosion

Completions, Conventional, Real Result, Weatherford World

Feb 02
2006
Jet Frac™ Straddle System Stimulates 15 Zones in One Run, Yielding 3,000 BOPD More Than Anticipated

Conventional, Intervention and Abandonment, Real Result, Weatherford World