|
Nov 01 2006
|
Tubing Packoffs with Live Gas-Lift Valves Restore Loaded High-Rate Gas Well to Production with Fast Payout
Aging Reservoirs, Conventional, Deepwater, Production, Real Result, Unconventional, Weatherford World
|
|
|
Oct 31 2006
|
Custom-Designed Gas-Lift Valve System Adds Up to 300 MCFD
Production, Real Result, Weatherford World
|
|
|
Oct 30 2006
|
Weatherford Gas-Lift Design Increases Production, Reduces Operating Costs
Aging Reservoirs, Conventional, Deepwater, Production, Real Result, Unconventional, Weatherford World
|
|
|
Aug 28 2006
|
Automatic Water Shutoff Solution Puts Major BP Subsea Well Back on Production, Removes Need for Second Intervention, Saving $5 Million
Conventional, Intervention and Abandonment, Real Result, Weatherford World
|
|
|
Jul 12 2006
|
Successful Sidetrack Through Hard Formation Saves BP America 25 Days
Aging Reservoirs, Conventional, Intervention and Abandonment, Real Result, Weatherford World
|
|
|
Jun 22 2006
|
StarBurst™ Multilateral System Enables ChevronTexaco to Commingle Production from Two Separate Reservoir Intervals
Aging Reservoirs, Conventional, Deepwater, Intervention and Abandonment, Real Result, Weatherford World
|
|
|
May 09 2006
|
Inaugural MillThru™ System Installation Provides Operator with Highest-Producing Multilateral in Field
Aging Reservoirs, Conventional, Intervention and Abandonment, Real Result, Weatherford World
|
|
|
Apr 11 2006
|
Triple-Zone Selective Gravel Pack Helps South Louisiana Independent Avoid Future Workovers to Save an Estimated $175,000
Completions, Conventional, Real Result, Weatherford World
|
|
|
Feb 28 2006
|
QuickPack™ Casing Exit System Drives Down Development Cost While Maximizing Reservoir Contact
Aging Reservoirs, Conventional, Intervention and Abandonment, Real Result, Unconventional, Weatherford World
|
|
|
Feb 23 2006
|
Expandable Sand Screen (ESS®) Overcomes Sand Plugging, High BHT, Severe Corrosion
Completions, Conventional, Real Result, Weatherford World
|
|