Innovative Rigless Retrofit

Restores Production While Slashing Costs, Reduces Carbon Footprint

Objectives

  • Install a gas-lift valve in a completion to continuously inject into the annulus instead of using coiled tubing.

Our Approach

  • Weatherford Well Services experts collaborated with the operator and deployed a retrofit gas-lift straddle system designed to inject nitrogen through the production casing (annulus A).
  • Key components and techniques included.
    • V0-rated WidePak™ II Packer: Ensured tubing seal integrity under demanding conditions.
    • Rigless Intervention: Utilized electric wireline for depth correlation and accuracy, followed by slickline operations for final deployment.
    • ISO EasySet Setting Tool: A non-explosive setting tool used to position the straddle top section safely and efficiently.
  • The intervention was completed without a rig, and the well was successfully brought back into production.

Value to Customer

  • The retrofit solution delivered significant operational and environmental benefits:
    • Reduced Operational Expenditure (OPEX): Eliminated the need for continuous coiled-tubing operations.
    • Lower Carbon Footprint: Minimized site emissions and physical footprint.
    • Cost Efficiency: Achieved substantial savings in artificial-lift-related expenses.
Details

Location

Southern Europe

Well Type

Oil producer

Products/Services

WidePak straddle system