Turning a Failed Section into a Completed Well

Managed Pressure Wells Approach Saves More Than $1 Million USD In Dynamic Gain/Loss Environment

Objectives

  • Drill the 12 1/4-in and 8 1/2-in sections through a shallow, highly dynamic gain/loss environment after a previous conventional approach failed to reach TD in the 12 1/4-in section and required plug and abandonment.
  • Manage severe crossflow and pressure communication likely influenced by injector activity and fault connectivity within a narrow operating pressure window.
  • Develop a field-specific managed pressure wells (MPW) philosophy to improve pressure management, section exit, isolation, casing-running strategy, and operational continuity in future wells.

Our Approach

  • Applied learnings from the prior section failure to build a structured MPW strategy for the next well.
  • Adjusted the operating philosophy from targeting a single stable balance point to maintaining equilibrium within a dynamically interacting pressure system influenced by faulted and previously injected intervals.
  • Used the Modus™ managed pressure wells solution and surface backpressure as active control tools while interpreting real-time pressure response, mud dilution, polymer contamination, instability cycles, and crossflow behavior.
  • Successfully managed a complex formation pressure interval while drilling the 12 1/4-in section between 2,475 ft (754 m) MD to TD at approximately 3,525 ft (1,074 m) MD. The highly dynamic gain/loss fluid conditions were caused by faulted formation intervals influenced by communication with other injector wells that induced evolving downhole pressure requirements.
  • Reached TD in the 12 1/4-in section, drilled the 8 1/2-in section, completed the well, and incorporated learnings into a field-specific MPW strategy for future wells.

Value to Customer

  • Enabled the operator to reach TD and complete the well after the previous 12 1/4-in section was plugged and abandoned, saving more than $1 million USD in rig time and materials.
  • Provided real-time pressure management in a shallow, highly dynamic gain/loss environment influenced by crossflow, injector communication, and fault connectivity.
  • Maintained operational continuity by using MPD surface backpressure as an active control parameter within an estimated 10 psi (0.07 MPa) operating window.
  • Established operational learnings and an engineering foundation for future optimization of instability management, section exit, isolation, casing-running strategy, and field-specific MPW planning.
Details

Location

India

Well Type

Horizontal, producer

Formation

Dharvi Dungar

Hole Size and Angle

12-1/4, 8-1/2 in, 70°

Casing Size

9-5/8, 5-1/2 in

Temperature

140 degF (60.2 degC)

Measured Depth

Section TD: 3,524 ft (1,074 m)

Products/Services

Modus managed pressure wells solution