Real Results

Performance By The Numbers

Unlocking Reservoir Potential While Drilling

Production-Ready Insights Delivered by LWD Services Reduces Uncertainty, Saves $1 Million USD

Objectives

  • Drill a directional appraisal well in the United Kingdom to confirm reservoir presence, quality, and hydrocarbon potential.
  • Acquire reliable formation pressure and connectivity data while drilling to improve reservoir understanding and reduce subsurface uncertainty around pressure regimes, compartmentalization, and fluid distribution.
  • Define a safe pore-pressure and fracture-gradient drilling window to support efficient execution of future development wells.
  • Strengthen confidence in formation evaluation, optimize future well placement, and support field-development planning.

Our Approach

  • Deployed an integrated PressureWave® formation tester with an extensive logging-while-drilling (LWD) suite that included the ShockWave® sonic tool, NDT™ neutron porosity and azimuthal density logging, MFR multifrequency resistivity sensor measurements, and the Magnus® Saker rotary steerable system (RSS).
  • Acquired real-time formation evaluation and downhole formation pressure data while drilling, reducing dependence on post-drilling contingency operations.
  • Through an adaptive testing strategy, Weatherford experts reduced stationary time and optimized pressure test buildup durations, mitigating stuck pipe risk and safeguarding wellbore integrity while delivering accurate, repeatable formation pressure data to support critical reservoir decisions.
  • Combined formation pressure measurements with petrophysical and imaging data to improve understanding of reservoir connectivity, pressure regimes, and fluid distribution.
  • Collaborated closely with Interpretation and Evaluation Services to translate real-time measurements into actionable reservoir insight.

Value to Customer

  • Delivered high-quality, real-time formation pressure data that reduced subsurface uncertainty and improved confidence in reservoir characterization.
  • Clarified pressure behavior, connectivity, and formation quality while drilling to support safer, more informed field-development decisions.
  • Eliminated the planned wireline contingency, saving the operator more than $1 million USD by avoiding wireline operations and reducing rig time.
  • Accelerated progress toward field development with actionable data acquired while drilling in an unknown pressure environment.

Contact Weatherford

Take the next step in realizing the field of the future. Submit your details and one of our optimization experts will be in touch.