Real Results
Performance By The Numbers
Cuts 27 Cemented Platform Well Conductors in a Batch Process Taking Only 10 Days
Location
Well Type
Hole Size and Angle
Casing Sizes
Depth
Products/Services
The Weatherford engineering department redesigned the MOST Plus system, a key technology in the Firma abandonment portfolio, for the requirements of the job. The above image shows finite element analysis (FEA) as part of the process.
The top image shows the MOST Plus system, a proven subsea wellhead recovery tool that latches onto the external profile of a subsea wellhead while a hydraulic internal casing cutter cuts the conductors. The bottom image shows a well conductor cut by this system and then recovered.