First Successful ALS Application in Borate Mining

Proves System Reliability, Boosts Production, and Enhances Efficiency within Highly Corrosive Well

Objectives

  • Produce borate and boric acid from an adapted mining well using hydrochloric acid (HCI) injected through a nearby surface well.
  • The modified lift system required a production rate from 400 to 1,000 bpd of solution. Additional needs included improved lift methods that could reliably withstand the corrosive conditions of boric acid as well as the bottom hole temperatures-all with better solids-handling over previous air-injection methods.

Our Approach

  • Weatherford designed an artificial lift solution (ALS) that included a specially adapted, insertable progressing cavity pump (I-PCP) system-recommended for its solids handling, fluid viscosity, and high bottom hole-pressure capabilities. These were all critical factors in developing an optimal system.
  • Existing ALS components were adapted and enhanced using advanced materials and engineering to ensure the I-PCP's durability and performance within such a highly corrosive, downhole environment.
  • The custom system also included a permanent-magnet motor for PCP (PMM-PCP) with embedded rare-earth materials and high torsion capability that produces a continuous 0.99 power factor and fewer CO2 emissions.

Value to Customer

  • The successful I-PCP installation (December 2023 with stable well operation beginning January 2024) achieved desired production without high-torque alarms and zero rod disconnections-proving the modified ALS technology for mining applications.
  • Production efficiency was increased through the I-PCP abrasion-resistant-rotor / elastomer-stator combination.
  • Operational costs and downtime were reduced by eliminating the need for frequent, labor-intensive tubing pulls.
  • Viability of the project proved that adapting oil and gas ALS technology was safe and effective for borate-production enhancements and overall efficiency in solution mining.
Details

Client

5E Advanced Materials

Location

Newberry Springs, California

Well Type

Borate-solution production well

Formation

Colemanite Layer

Casing Size and Type

7 x 3-1/2 in. (177.8 x 88.9 mm) fiber-reinforced plastic (FRP) tubing

Temperature

Bottom hole temperature 122°F (50°C)

Depth

1,300 ft (400 m)

Flow Rate

1,000 bpd (158 m3/d)

Products/Services

First Successful ALS Application in Borate Mining

Contact Weatherford

Take the next step in realizing the field of the future. Submit your details and one of our optimization experts will be in touch.