Resource Hub
LATEST BROCHURES
-
Well Barriers
March 12, 2026
Completions
-
Progressing Cavity Pump Poster
March 9, 2026
Production
-
TOPS® FAQs
February 24, 2026
FAQs, Production
-
Magnus® Saker Rotary Steerable System
February 9, 2026
Drilling
LATEST TECHNICAL SPECIFICATIONS
-
ForeSite Sense Optical
February 26, 2026
Completions
-
Magnus® Saker Rotary Steerable System
February 12, 2026
Drilling
-
ISO-Flex™ High-Expansion Retrievable Bridge Plug
February 11, 2026
Intervention and Abandonment
-
Turbulent Oil and Particulate Separator TOPS®
January 29, 2026
Production
LATEST HIGHLIGHTED CASE STUDIES
-
Magnus® Saker RSS Drills 4,800-ft Section With Zero Failures, Demonstrates Exceptional Endurance in Gas Drilling Conditions
Middle East
-
High-Risk to High-Value Magnus® Saker RSS Maximizes Reservoir Contact in High-Temperature Carbonate Layer, Saves 7.4 Days
Middle East
LATEST REAL RESULTS
-
Redefining Drilling Speed Magnus® Saker RSS Delivers 70% ROP Above Target in Complex Carbonate Formation
February 4, 2026
Abu Dhabi
-
Magnus® Saker RSS Delivers 1,663‑ft in 346 Operating Hours in Harsh, Deep Drilling Environment While Maintaining Directional Control
February 4, 2026
Kuwait
-
Magnus® Saker RSS Drills 4,800-ft Section With Zero Failures, Demonstrates Exceptional Endurance in Gas Drilling Conditions
February 2, 2026
Saudi Arabia
-
High-Risk to High-Value Magnus® Saker RSS Maximizes Reservoir Contact in High-Temperature Carbonate Layer, Saves 7.4 Days
January 28, 2026
Abu Dhabi
LATEST PAPERS
-
Novel Foam-Assisted Gas Lift Technology for Resuscitation of High-Salinity and High-GOR Oil Wells
November 3, 2025
-
Integrated Pulsed Neutron Logging and Nuclear Modelling for Formation Saturation and Gravel Pack Integrity Evaluation in Complex Sand Control Completions
November 3, 2025