Highlighted Case Studies

All highlighted case studies

Underbalanced Workover Removed Scale from Environmentally Sensitive Geothermal Well, Enabled Submers

Germany

Reservoir Evaluation System, Production Logging Recognized Gas Retrograde Condensate for Newly Disco

Pakistan

Magnus® RSS, MPD Techniques Combined to Mitigate Ballooning Effect, Reduced Drilling Time by 25%, El

Mexico

ISO-Flex™ High-Expansion Retrievable Bridge Plug Overcomes Well Obstruction During Temporary Abandon

Brazil

Vero® Automated Connection Integrity Made Up 3,000 Connections, Saved Over 42 Hours of Rig Time for

Gulf of Mexico

Firma™ Plug and Abandonment Solutions Reduced C02 Emissions by 91% in Lump Sum Turnkey Well Decommis

Oman

Advanced Well Integrity, Reservoir Monitoring Analysis Identified Leak Zones Stemming from Corrosion

Middle East

Managed Pressure Drilling, Cementing Eliminated Intermediate Contingency Liner in Ultra-Deepwater We

Gulf of Mexico (Mexico)

Vero® Automated Connection Integrity Enabled Casing Running, Testing of Deepwater Well, Reduced Risk

Colombia

Advanced Logging Tools, Reservoir Analysis Located and Quantified Downhole Sand Production, Minimize

Kuwait