ForeSite® Edge Leverages High-Frequency Data and Autonomous Control to Boost Production 38%
Southeast Asia
|
|
ForeSite® Injection Rate Optimization and Gas Lift Analysis Achieves 25% Higher Production, a $1.2M
Texas, USA
|
|
Integrated Services Planned, Engineered, and Managed a Project That Intercepted and Remediated a Poo
United Kingdom
|
|
ForeSite® Edge Boosts Production 25%, Eliminates Wellsite Visits 65%, Reduces Failures 15%
Permian Basin, USA
|
|
Close Partnership, Specialized Technologies, Operational Efficiencies Delivered Best-in-Class Geothe
Bavaria, Germany
|
|
ForeSite® Edge Enhances Well Production by 12%, Reduces Site Visits by 50% in an Unconventional Fiel
USA, Rockies Area
|
|
ForeSite® Autonomous Control Increases Production by 20 STBPD, Simplifies Rod-Lift Operations, Impro
USA, North Dakota
|
|
ForeSite® EDGE Increases Oil Gains Over 20% with Autonomous Control Logic
Canada
|
|
Slot Recovery Solutions Provides Single-Source, Casing Cut & Pull and Side Track from Shallow Depth,
UAE, Abu Dhabi
|
|
Interpretation and Evaluation Services Determined Stratigraphic and Structural Features for Developm
Australia
|
|