Real Results

All real results

Date Name
Nov 22
2024
I-Wheel™ Tandem Sub Saves 84 Hours Operating Time

Formation Evaluation, Real Result, Weatherford World

Nov 22
2024
Relative Bearing Tool Used to Determine Optimum Perforating Configuration

Formation Evaluation, Real Result, Weatherford World

Nov 22
2024
SPITFire™ Release Tool Performs with 100% Success Rate in Greaseless Wireline Campaign

Formation Evaluation, Real Result, Weatherford World

Nov 22
2024
SMART Sens™ Delivers Pump Down Assurance in Extended Reach Lateral

Formation Evaluation, Real Result

Nov 22
2024
Articulating Hole Finder™ Enables Logging in Challenging Southeast Asia Well

Formation Evaluation, Real Result, Weatherford World

Nov 14
2024
ForeSite® Edge Mitigates Oil Production Decline 3.7%, Reduces Failure 11%, Saves Approximately $344,000 Per Year for 10 Project Wells

Production, Real Result, Weatherford World

Nov 07
2024
Reclaim™ Thru-Tubing P&A Solution Sets Cement Plugs Across Dual-Casing Annulus, Main Bore Using Coiled Tubing, Eliminates Section Milling Operations

Completions, Real Result, Weatherford World

Nov 05
2024
Magnus® Rotary-Steerable System Achieved Longest 12 1/4-in. Sidetrack Run of an Extended Reach Well in Field, Saved 26 Days of Drilling Time

Drilling, Real Result, Weatherford World

Oct 16
2024
AlphaV™ Single-Trip Casing-Exit System and AccuView® Real-Time Remote Support Enables Equinor Dual-Casing Exit in One Run Saving 14 Hours’ Rigtime and Associated OPEX

Intervention and Abandonment, Real Result, Weatherford World

Oct 11
2024
Magnus® RSS, RipTide® Drilling Reamer Drilled and Enlarged Well From 12-1/4 to 13-1/2 in. During First Tandem Run, Increased On-Bottom ROP by 61%

Drilling, Real Result, Weatherford World