Real Results

All real results

Date Name
Jul 25
2017
Compact™ Thru Drillpipe Tools and Testers Provide Complete Well Characterization Despite Washouts and 48° Deviation, Save 60 Hr of Rig Time

Formation Evaluation, Real Result

Jul 25
2017
Raptor System Delivers Accurate Saturation Data in >80 Wells, Optimizes Production Strategy For Water-Flood Project

Formation Evaluation, Real Result

Jul 21
2017
At-Bit Measurement System Reached TD in Basal Sand Well with Zero NPT, Reduced Sliding Rate from 55% to 32.5%

Formation Evaluation, Real Result, Weatherford World

Jun 28
2017
BlackCat Retrievable Sealbore Packer Enables Rigless Installation of Velocity String and Saves $200,000 Per Future Intervention

Intervention and Abandonment, Real Result, Weatherford World

Jun 28
2017
Thru-Tubing Services Revives Shut-In Well, Achieves Sand-Free Production of 600 BOPD

Intervention and Abandonment, Real Result

Jun 28
2017
Shortstak® Production Logging System Avoids Unnecessary Workover for Operator

Aging Reservoirs, Conventional, Production, Real Result, Weatherford World

Jun 28
2017
NMRT™ Sensor, HMI® Sensor Provide Fluid-Flow Imaging Data, Ensure Environmental Compliance

Aging Reservoirs, Formation Evaluation, Real Result, Weatherford World

Jun 16
2017
ESS® Expandable Sand Screen Provides One-Trip Installation, Zero Sand-Control Failures in 54 Wells

Completions, Real Result, Weatherford World

Jun 12
2017
Plunger-Lift System with WellPilot® Controller Increases Gas and Condensate Production 43 to 50%, Reduces Cost by $52,300 Per Year

Production, Real Result, Weatherford World

Mar 13
2017
Endura® Dual-String Section Mill Deployed Offshore for First Time to Provide Rock-to-Rock Cement Barrier, Saves $1.88 Million in Rig Time

Aging Reservoirs, Conventional, Deepwater, Intervention and Abandonment, Real Result, Weatherford World