Real Results

All real results

Date Name
May 16
2016
Plug Locator System Avoids a Wet Shoe For Proper Cementing Across Salt Layer, Saves 3 Days of Rig Time

Drilling, Real Result, Weatherford World

May 16
2016
QuickCut™ System, FloReg™ ICD Enable Record Setting Openhole Sand Screen Completion

Aging Reservoirs, Conventional, Intervention and Abandonment, Real Result, Weatherford World

May 09
2016
VariForm® Centralizer Enables Running 12,220-ft Casing String to TD, Saves More Than 3 Days of Rig Time

Drilling, Real Result, Weatherford World

May 09
2016
Compact™ Logging Services Enable Full Openhole Logging of Extremely Slim Exploratory Well

Conventional, Formation Evaluation, Real Result, Weatherford World

May 06
2016
Drilling with Casing System with Defyer® Drillable Casing Bit Successfully Drills Through Total Losses Zones, Saves 17.6 Days

Real Result, Tubular Running Services, Weatherford World

Apr 29
2016
Compact™ Drop-Off Ends 3 Days of NPT, Logs Difficult Well, Confirms Rock Properties

Conventional, Formation Evaluation, Real Result, Weatherford World

Apr 28
2016
Red Eye® 2G Hot-Tap Water-Cut Meters Installed Offshore in Total Crude Export Line Provide Real-Time Flow Measurements for Proactive Production Management

Conventional, Production, Real Result, Weatherford World

Apr 20
2016
Capillary-Injection Tubing Anchor Saves Nearly $2 Million in 25-Well Campaign in 1st Year of Service

Aging Reservoirs, Conventional, Production, Real Result, Unconventional, Weatherford World

Apr 20
2016
Compact™ Well Shuttle Safely Logs a Live Gas Well While Maintaining Underbalanced Pressure Conditions

Conventional, Formation Evaluation, Real Result, Weatherford World

Apr 11
2016
Liner and Cementing Solution Saves 6 Days of Rig Time in Challenging Offshore Formation

Drilling, Real Result, Weatherford World