Real Results

All real results

Date Name
Feb 13
2015
Re-Entry Services Team Expedites Large-Bore, Dual-String Casing Exit in Remote Location and Saves Client One Day of Rig Time

Aging Reservoirs, Conventional, Intervention and Abandonment, Real Result, Weatherford World

Feb 04
2015
RapidFlo™ Plungers and Monitoring with CygNet® Software Increased Production in Declining Horizontal Gas Wells

Aging Reservoirs, Production, Real Result, Unconventional, Weatherford World

Jan 27
2015
Integrated Services Installs Record-Length Expandable Liner To Eliminate H2S Intrusion and Restore Production

Aging Reservoirs, Conventional, Real Result, Unconventional, Weatherford World

Jan 20
2015
Flexisert™ Insertable Progressing Cavity Pump Anchor Reduces Workover Cost by Nearly 80%

Aging Reservoirs, Conventional, Production, Real Result, Weatherford World

Jan 15
2015
Free-Rotating Eccentric Guide Shoe Enables TD for 400,000-lb Casing String in Extended-Reach Well, Avoids NPT

Drilling, Real Result, Weatherford World

Jan 15
2015
Onshore Bucking Facility Reduces Run Time by 33%, Saves Operator $83,000

Real Result, Tubular Running Services, Weatherford World

Jan 15
2015
Capillary Injection String Increases Gas Production by 160% in Well, Adding $1600 in Revenue per Day

Production, Real Result, Unconventional, Weatherford World

Dec 15
2014
Weatherford Asia Pacific Successfully Completes Abandonment of Iwaki Platform Offshore Japan in 62 days

Aging Reservoirs, Conventional, Deepwater, Intervention and Abandonment, Real Result, Weatherford World

Dec 03
2014
Reciprocating-Rod Lift System Increases Run Life by 26 Times From Less Than 30 Days to Nearly 800 Days

Aging Reservoirs, Conventional, Production, Real Result, Unconventional, Weatherford World