Real Results

All real results

Date Name
Aug 13
2024
ForeSite® Edge Leverages High-Frequency Data and Autonomous Control to Boost Production 38%

Production, Real Result, Weatherford World

Aug 12
2024
Geochemical Spectroscopy Instrument Enabled Comprehensive Cased-Hole Formation Evaluation, Saved $100,000, Reduced Risk During Re-Entry

Formation Evaluation, Real Result, Weatherford World

Jul 25
2024
ForeSite® Injection Rate Optimization and Gas Lift Analysis Achieves 25% Higher Production, a $1.2M Reduction in OPEX

Production, Real Result, Weatherford World

Jul 17
2024
WEL-Sure™ LCM With Non-Damaging Diverting Carrier Fluid Controlled Losses, Enhanced Sand Cleanout Efficiency, Preventing Formation Damage

Drilling, Real Result, Weatherford World

Jun 26
2024
ForeSite® EDGE Boosts Production 25%, Eliminates Wellsite Visits 65%, Reduces Failures 15%

Production, Real Result, Weatherford World

Jun 25
2024
ForeSite® Edge Enhances Well Production by 12%, Reduces Site Visits by 50% in an Unconventional Field

Production, Real Result, Weatherford World

Jun 24
2024
AlphaV™ Single-Trip Casing-Exit System Eliminated Dedicated Wellbore-Preparation Run Increased Trip Speed 150%, Saving a Total of 20 Hours’ Rigtime

Intervention and Abandonment, Real Result, Weatherford World

Jun 24
2024
RipTide® Single Ball Drop Reamer Enlarged 12 14 x 17 12-in. Well Under a Dual-Bore Landing Ring in a Single Run

Drilling, Real Result, Weatherford World

Jun 12
2024
1D Geomechanics, Wellbore Stability Analysis Enabled Operator to Drill Salt Formation in One Run After Three Failed Sidetrack Attempts in Offset Wells

Formation Evaluation, Real Result, Weatherford World

Jun 10
2024
ForeSite® Autonomous Control Increases Production by 20 STBPD, Simplifies Rod-Lift Operations, Improves Response Time

Production, Real Result, Weatherford World