Real Results

All real results

Date Name
Aug 14
2014
Dailey® Dual-Jar Configuration, JarPro Program Free Drillstring in Horizontal Well, Save Rig Time and Costs

Drilling, Real Result, Weatherford World

Aug 05
2014
Reciprocating Rod Lift Systems Increase Production by 20%, Reduce Idle Wells from 62% to 40%

Aging Reservoirs, Conventional, Production, Real Result, Weatherford World

Jun 26
2014
First Axiom™ Series Liner System Installed in Kuwait Proves Reliability of the Technology

Drilling, Real Result, Weatherford World

Jun 26
2014
Automated Side Door Elevator Enhances Safety by Eliminating Manual Work in the Rig-Floor Danger Zone

Real Result, Tubular Running Services, Weatherford World

Jun 23
2014
Weatherford Collaborative Liner System and Cementing Product Services Enable Operator to Drill Production Zone

Drilling, Real Result, Weatherford World

Jun 20
2014
SwageSet Liner-Top Packer Provides Operator Reliable Liner-Top Isolation, Enables Production Zone to be Drilled

Drilling, Real Result, Weatherford World

Jun 20
2014
SwageSet Liner-Top Packer Used in Scab Liner Restores Well Integrity and Saves Major Operator Costs and Time

Drilling, Real Result, Weatherford World

Jun 16
2014
Weatherford Collaborative Liner System and Cementing Product Services Enable Client to Test Production Zone

Drilling, Real Result, Weatherford World

May 02
2014
DwC™ Services Save 34 Hours of Rig Time, Complete Casing Run in Single Trip

Real Result, Tubular Running Services, Weatherford World

Apr 21
2014
DwC™ Services Mitigate Drilling Hazards, Reduce NPT in Challenging Formation

Real Result, Tubular Running Services, Weatherford World